Inspections for the day of: Tuesday, April 29, 2003.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD03-00855 BLD-Wall cover4/28/20034/29/20034/29/2003 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 4/28/2003 at 8:12:39 AM. Contact: ###-####.
$44.10 reinspect fee 4/29/2003 11:09:48 AM
BLD03-00825 BLD-Foundation4/28/20034/29/20034/29/2003 12:00:00 AMAPART
###-#### DAVE
BLD03-00756 BLD-Framing/Rough-in4/28/20034/29/20034/29/2003 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 4/28/2003 at 12:28:07 PM. Contact: ###-####.
at gate call for Gibson on keypad,,,
frame ok,,, ok to insulate,, verify franklin info and seal package at energy code insp. 4/29/2003 10:10:10 AM
BLD03-00166 BLD-Other4/28/20034/29/20034/29/2003 12:00:00 AMANR
Scheduled by a contractor via Hello! on 4/28/2003 at 12:37:08 PM. Contact: ###-####.
MEC03-00629 Final4/28/20034/29/20034/29/2003 12:00:00 AMAPASS
Phone #: ###-#### Internet Inspection Request from: Sherri Petterson
BLD03-00095 BLD-Final4/29/20034/29/20034/29/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 4/29/2003 at 7:01:15 AM. Contact: ###-####.
c of c issued 4/29/2003 10:25:13 AM
BLD03-00768 BLD-Footing4/29/20034/29/20034/29/2003 12:00:00 AMPPART
CARL; Phone #: ###-#### Internet Inspection Request from: Darla Down
house add. ftgs, hot tub rear ftgs 4/29/2003 3:03:07 PM
BLD03-00344 BLD-Framing/Rough-in4/29/20034/29/20034/29/2003 12:00:00 AMPPART
harry shear; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
ext. shear nailing ok,, need to verify floor to floor straps later 4/29/2003 3:30:12 PM
BLD03-00651 BLD-Footing4/29/20034/29/20034/29/2003 12:00:00 AMPPART
rob ; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
1/2 way poured, appears ok, 4/29/2003 2:48:01 PM
BLD03-00558 BLD-Footing4/29/20034/29/20034/29/2003 12:00:00 AMPPART
###-####
wip 4/30/2003 8:53:31 AM
BLD03-00008 BLD-Foundation4/28/20034/29/20034/29/2003 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 4/28/2003 at 6:49:07 PM. Contact: ###-####.
wip, 4' walls in rear 4/29/2003 3:27:26 PM