BLD03-00372
| BLD-Framing/Rough-in | 4/28/2003 | 4/29/2003 | 4/29/2003 12:00:00 AM | A | PART |
|
|
###-#### TERRY C/N--Ok to insulate. 4/29/2003 8:50:24 AM
|
BLD03-00714
| BLD-Wall cover | 4/28/2003 | 4/29/2003 | 4/29/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 4/28/2003 at 1:53:21 PM. Contact: ###-####.
|
BLD03-00139
| BLD-Framing/Rough-in | 4/28/2003 | 4/29/2003 | 4/29/2003 12:00:00 AM | A | PART |
|
|
SCOTT SHEAR NAIL; Phone #: ###-#### Internet Inspection Request from: Darla DownsShear--ok to cover 4/29/2003 10:44:29 AM
|
ESC02-00898
| Site Preparation | 4/29/2003 | 4/29/2003 | 4/29/2003 12:00:00 AM | A | FAIL |
|
|
BMP's not in place per plan. Contacted RP--Mike--###-####--will correct. Follow-up will occur. 4/29/2003 10:50:51 AM
|
ESC03-00334
| Site Preparation | 4/29/2003 | 4/29/2003 | 4/29/2003 12:00:00 AM | P | PART |
|
|
Talked to J. Conger RP--###-#### in regards to potential problem for erosion along irrigation canel. Will follow-up 4/29/2003 3:18:24 PM
|