Inspections for the day of: Thursday, April 29, 2004.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRick Jackson
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD03-00430 FIRE-Conference3/18/20044/29/20044/30/2004 12:00:00 AMPPART
Follow up for 25 day notice issued on March 18th Info on past notices provided to PDS for review 4/30/2004 3:38:05 PM
FIR03-00805 FIR-Aging Inspection4/29/20044/29/20044/29/2004 12:00:00 AM PASS
Work is still in progress 4/29/2004 7:11:27 AM
FIR04-00230 INSP-Sprinkler Rough-in/Hydro4/28/20044/29/20044/29/2004 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 4/28/2004 at 4:51:07 PM. Contact: ###-####. Tenting completed; lintel is 20 inches and not over 9 ft off wall on first floor per plan notes; head relocated in game room to keep at 8 ft from walls; will require flush and test bell 4/29/2004 2:55:50 PM
BLD00-01151 FIRE-Conference4/27/20044/29/20044/29/2004 12:00:00 AMAPART
WENDY; Phone #: ###-#### Internet Inspection Request from: Annette Moore//PERMIT REOPENED PER DAVE HANNAH Need plans for smoke ventilation of elevator shaft and smoke/fire damper operation on third floor; closure and smoke seals on rated doors 4/29/2004 10:16:49 AM
FIR04-00156 INSP-Final Inspection4/28/20044/29/20044/29/2004 12:00:00 AMAFAIL
Could we set this up for 9:00AM. Jonathan Lee is the contact. Please call upon arrival. Thanks; Phone #: ###-#### Internet Inspection Request from: Trent Bice Rooms for previous okay to cover; lobby overspaced and lobby to west not completed; janitor requires 401; marked on plans; resubmittals needed 4/29/2004 8:41:41 AM
FIR04-00118 INSP-Sprinkler Rough-in/Hydro4/28/20044/29/20044/29/2004 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 4/28/2004 at 1:06:32 PM. Contact: ###-####. Hydro was okay; heads added under duct are too close to other heads and will need to be relocated 4/29/2004 2:04:53 PM
FIR03-00477 INSP-Final Inspection4/28/20044/29/20044/29/2004 12:00:00 AMAFAIL
jim ; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley need lockout on bell breaker 4/29/2004 4:50:29 PM
FIR03-00788 INSP-Final Inspection4/28/20044/29/20044/29/2004 12:00:00 AMPFAIL
clifford miller; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Need detector at new damper; elevator recall has primary floor only 4/29/2004 4:49:46 PM
FIR04-00118 INSP-Final Inspection4/28/20044/29/20044/29/2004 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 4/28/2004 at 1:07:17 PM. Contact: ###-####. Hydro okay; heads added under duct are too close to other heads and will need to be relocated 4/29/2004 2:05:21 PM
BLD04-00303 FIRE-Final Inspection4/28/20044/29/20044/29/2004 12:00:00 AMPPASS
steve; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD04-00115 FIRE-Final Inspection4/26/20044/29/20044/29/2004 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 4/26/2004 at 2:20:38 PM. Safety will add NFPA 704 diamond at door to room 4/29/2004 2:06:12 PM
BLD03-02023 FIRE-Sprinkler Rough-in4/29/20044/29/20044/29/2004 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 4/29/2004 at 7:49:20 AM. Contact: ###-####. Okay to cover 4/29/2004 2:56:03 PM
FIR03-00565 INSP-Final Inspection4/29/20044/29/20044/29/2004 12:00:00 AMPPASS