ESC04-00011
| Site Preparation | 4/28/2004 | 4/29/2004 | 4/29/2004 12:00:00 AM | A | PART |
|
|
D. Feldman RP ###-####. Reviewed the site with Dan. Suggested a few additional bmp's be installed at misc. locations. Slopes to be stablized when final grading is complete. Maintain bmp's, if conditions change be ready to add additional bmp's... Overall site looks good. Sweep any trackout from hard surfaces. 4/29/2004 2:08:04 PM
|
ESC04-00092
| Site Preparation | 4/29/2004 | 4/29/2004 | 4/29/2004 12:00:00 AM | P | PART |
|
|
No sign and wrong rp. Correct. Verbal correction. 4/29/2004 2:53:06 PM
|
ESC04-00067
| Site Preparation | 4/29/2004 | 4/29/2004 | 4/29/2004 12:00:00 AM | P | PART |
|
|
Informed contractor that drop inlet protection is needed and stormwater sign is not posted. Construction entrance is in place, minor track out was observed. Sweep daily or as needed. Will follow up. 4/29/2004 3:39:10 PM
|