Inspections for the day of: Tuesday, April 29, 2008.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR08-00129 INSP-Final Inspection4/28/20084/29/20084/30/2008 2:27:18 PMANR
Work is not ready for inspection per conversation with contractor.
BLD07-02078 FIRE-Conference4/29/20084/29/20084/29/2008 5:23:15 PMPDONE
Work in progress
FIR08-00180 INSP-Sprinkler Rough-in/Hydro4/29/20084/29/20084/29/2008 5:22:48 PMANR
New supply line pipe hydrostatic test is not ready for inspection due to leakage per contractor, also okayed areas as red-lined on approved plan set at the front office entry hard lids-noted three ret. straps to be attatched and one head to be relocated for correct min. spacing requirements.
FIR08-00130 INSP-Sprinkler Rough-in4/28/20084/29/20084/29/2008 1:22:20 PMAPART
Approved overhead rough-in at all areas except as noted in two locations including a missed head and one branch line arm-over to be re-routed due to excessive pipe deflection radius. Cold cavity tenting appears satisfactory.
FIR06-00621 INSP-Alarm Testing4/23/20084/29/20084/29/2008 1:18:04 PMAPART
Horn and strobe testing completed for the cleanroom areas only, noted locations on plan in need of revision.
FIR06-00620 INSP-Alarm Testing4/23/20084/29/20084/29/2008 1:17:31 PMAPART
Horn and strobe testing completed for the cleanroom areas only, noted locations on plan in need of revision.
BLD06-01538 FIRE-Final Inspection4/28/20084/29/20084/29/2008 8:47:20 AMAFAIL
Noted one smoke alarm at the second floor hallway unti 2173 that is not interconnected, unit 2175 is not ready for final life safety at this time due to condition of the project and missing smoke alarms not yet installed.