MEC07-00695
| Final | 4/29/2008 | 4/29/2008 | 4/29/2008 6:28:34 PM | P | PASS |
|
|
chris
|
MEC08-01208
| Final | 4/29/2008 | 4/29/2008 | 4/29/2008 6:28:02 PM | P | PASS |
|
|
|
MEC08-01208
| Rough-in | 4/29/2008 | 4/29/2008 | 4/29/2008 6:27:39 PM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: April Sims
|
MEC07-01480
| MEC-Aging Inspection | 4/29/2008 | 4/29/2008 | 4/29/2008 6:27:23 PM | | PASS |
|
|
wip
|
MEC08-01208
| Pressure Test | 4/29/2008 | 4/29/2008 | 4/29/2008 6:27:04 PM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: April Sims...range vent only/under floor
|
MEC08-01003
| Rough-in | 4/29/2008 | 4/29/2008 | 4/29/2008 6:25:20 PM | P | NR |
|
|
Phone #: ###-#### Internet Inspection Request from: Doramus Cassi....waiting for electrical to finish
|
MEC08-00739
| Final | 4/29/2008 | 4/29/2008 | 4/29/2008 3:12:30 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 4/29/2008 at 8:38:27 AM. Contact: ###-####.
|
MEC08-00961
| Conference | 4/28/2008 | 4/29/2008 | 4/29/2008 1:04:46 PM | A | PASS |
|
|
MEET GARY AT 1###-####...discussed pink batting in above grid r/a plenum
|
MEC07-00695
| Pressure Test | 4/28/2008 | 4/29/2008 | 4/29/2008 11:17:42 AM | A | PASS |
|
|
Please call Chris before arrival. Customer is having the gas meter relocated so we need to move the gas line approx. 3 feet. Thank you!! Phone #: ###-#### Internet Inspection Request from: Veronica Shipley
|
MEC08-01240
| Conference | 4/28/2008 | 4/29/2008 | 4/29/2008 11:16:47 AM | A | PASS |
|
|
Ben Livingston is the field contact. Conference meeting @ 9am. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet...met with dave h and rocky and ben to discuss dryer vents, cook-top clearances, etc
|
MEC07-03043
| Final | 4/28/2008 | 4/29/2008 | 4/28/2008 6:22:12 PM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: April Sims
|