Inspections for the day of: Tuesday, April 29, 2008.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDixie Fellows
TitleMEC-COM/RES INSPECTOR
Phone #794-6208
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC07-00695 Final4/29/20084/29/20084/29/2008 6:28:34 PMPPASS
chris
MEC08-01208 Final4/29/20084/29/20084/29/2008 6:28:02 PMPPASS
MEC08-01208 Rough-in4/29/20084/29/20084/29/2008 6:27:39 PMPPASS
Phone #: ###-#### Internet Inspection Request from: April Sims
MEC07-01480 MEC-Aging Inspection4/29/20084/29/20084/29/2008 6:27:23 PM PASS
wip
MEC08-01208 Pressure Test4/29/20084/29/20084/29/2008 6:27:04 PMPPASS
Phone #: ###-#### Internet Inspection Request from: April Sims...range vent only/under floor
MEC08-01003 Rough-in4/29/20084/29/20084/29/2008 6:25:20 PMPNR
Phone #: ###-#### Internet Inspection Request from: Doramus Cassi....waiting for electrical to finish
MEC08-00739 Final4/29/20084/29/20084/29/2008 3:12:30 PMPPASS
Scheduled by a contractor via Hello! on 4/29/2008 at 8:38:27 AM. Contact: ###-####.
MEC08-00961 Conference4/28/20084/29/20084/29/2008 1:04:46 PMAPASS
MEET GARY AT 1###-####...discussed pink batting in above grid r/a plenum
MEC07-00695 Pressure Test4/28/20084/29/20084/29/2008 11:17:42 AMAPASS
Please call Chris before arrival. Customer is having the gas meter relocated so we need to move the gas line approx. 3 feet. Thank you!! Phone #: ###-#### Internet Inspection Request from: Veronica Shipley
MEC08-01240 Conference4/28/20084/29/20084/29/2008 11:16:47 AMAPASS
Ben Livingston is the field contact. Conference meeting @ 9am. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet...met with dave h and rocky and ben to discuss dryer vents, cook-top clearances, etc
MEC07-03043 Final4/28/20084/29/20084/28/2008 6:22:12 PMAPASS
Phone #: ###-#### Internet Inspection Request from: April Sims