PLM11-00436
| Plumbing Rough-in | 4/29/2011 | 4/29/2011 | 4/29/2011 5:00:46 PM | P | PASS |
|
|
molly - 3:00 pm Phone #: ###-####
|
ESC11-00241
| Site Preparation | 4/29/2011 | 4/29/2011 | 4/29/2011 5:00:34 PM | | CANC |
|
|
|
GCP11-00044
| GCP- Rough-in | 4/28/2011 | 4/29/2011 | 4/29/2011 3:53:40 PM | A | PART |
|
|
Rough-In (Conference for Landscape Sprinkler)John @ ###-####Call in advance - PM Inspection Please conference only
|
PLM10-02370
| Final | 4/29/2011 | 4/29/2011 | 4/29/2011 2:23:47 PM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Scott Hurren
|
PLM11-00378
| Final | 4/28/2011 | 4/29/2011 | 4/29/2011 1:47:51 PM | P | PASS |
|
|
Rob Phone #: ###-####
|
PLM11-00724
| Plumbing Rough-in | 4/28/2011 | 4/29/2011 | 4/29/2011 1:44:41 PM | P | PASS |
|
|
David Phone #: ###-####
|
PLM11-00723
| Final | 4/28/2011 | 4/29/2011 | 4/29/2011 1:03:41 PM | A | PASS |
|
|
DAVID Phone #: ###-####
|
PLM11-00705
| Plumbing Rough-in | 4/29/2011 | 4/29/2011 | 4/29/2011 10:19:27 AM | A | PASS |
|
|
|
PLM11-00705
| Groundwork | 4/28/2011 | 4/29/2011 | 4/29/2011 10:19:13 AM | A | PASS |
|
|
Todd will be onsite for inspection. Phone #: ###-#### >> Inspection requested via web by Carol Hazen
|
PLM11-00097
| Final | 4/29/2011 | 4/29/2011 | 4/29/2011 9:51:55 AM | A | PART |
|
|
as per cross conection control manual 6th edition and upc 2003 . after walk through with united water purveyor and plumbing contractor. additional backflow protection will be required on the following items. 1. RP on ice cream machine,s 2. RP on cooling water to condensing unit for walk-in cooler 3.RP on swamp cooler,s or an approved air gap 4. RPon chemical dispencer or approved air gap,s note need seperate water supply to chemical dispencer. 5. need double check installed on coffee machine 6.RP on cooling water to ice machine 7. note all water filter,s to be installed down stream of all backflow devices new or existing, items need to be done prior to final on remodel contractor to call when ready
|