BLD11-00626
| FIRE-Final Inspection | 4/29/2011 | 4/29/2011 | 4/29/2011 2:56:06 PM | P | PASS |
|
|
life safety passed.
|
BLD10-00114
| FIRE-Final Inspection | 4/29/2011 | 4/29/2011 | 4/29/2011 2:17:32 PM | P | PASS |
|
|
life safety passed
|
FIR11-00190
| INSP-Sprinkler Rough-in | 4/29/2011 | 4/29/2011 | 4/29/2011 1:36:41 PM | P | FAIL |
|
|
I've stopped at the job site twice today and both times the doors have been locked with no access. No inspection performed.
|
FIR11-00119
| INSP-Sprinkler Rough-in | 4/28/2011 | 4/29/2011 | 4/29/2011 11:04:34 AM | A | PASS |
|
|
See the city approved plans for the area with todays date where the sprinkler piping can be covered.
|
BLD10-01875
| FIRE-Final Inspection | 4/29/2011 | 4/29/2011 | 4/29/2011 11:03:49 AM | P | PART |
|
|
Life safety in phases 3 and 5 are complete
|
FIR10-00556
| INSP-Sprinkler Rough-in | 4/28/2011 | 4/29/2011 | 4/29/2011 11:03:20 AM | A | PART |
|
|
Phase 3 and 5 are complete
|
FIR11-00014
| INSP-Sprinkler Rough-in | 4/28/2011 | 4/29/2011 | 4/29/2011 11:02:56 AM | A | PART |
|
|
Phase 3 and 5 are complete
|
BLD11-00678
| FIRE-Final Inspection | 4/29/2011 | 4/29/2011 | 4/29/2011 9:43:22 AM | P | CANC |
|
|
Missing the city approved plans. The sprinkler system was verified to have its annual inspection. A dead bolt has been installed on the rear door to the common restrooms with no other exiting being provided.
|
BLD10-00038
| FIRE-Final Inspection | 4/29/2011 | 4/29/2011 | 4/29/2011 12:00:00 AM | P | PASS |
|
|
claire Phone #: ###-####
|