FIR13-00062
| INSP-Sprinkler Rough-in | 4/29/2014 | 4/29/2014 | 4/29/2014 5:25:09 PM | A | PART |
|
|
Overhead rough-in passed
|
FIR13-00580
| INSP-Sprinkler Rough-in | 4/29/2014 | 4/29/2014 | 4/29/2014 5:22:46 PM | P | PART |
|
|
Endo room number 4 as marked and dated on plans approved for ceiling cover.
|
FIR14-00215
| INSP-Sprinkler Rough-in | 4/29/2014 | 4/29/2014 | 4/29/2014 5:21:47 PM | P | PASS |
|
|
Overhead work at the remodeled conference room approved for cover.
|
FIR13-00608
| INSP-Sprinkler Rough-in | 4/28/2014 | 4/29/2014 | 4/29/2014 5:20:45 PM | A | PART |
|
|
6th floor elevator staging area okayed for cover- changes to pipe routing to be reflected on revised plan set.
|
BLD13-01678
| FIRE-Final Inspection | 4/17/2014 | 4/29/2014 | 4/29/2014 5:18:08 PM | A | FAIL |
|
|
Cathline ###-####-call 20 minutes prior Cathline would like both inspections done at the same time
|