Inspections for the day of: Tuesday, April 29, 2014.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR11-00096 FIR-Aging Inspection4/29/20144/29/20145/7/2014 7:26:24 AM NR
I spoke to Brian about getting this permit finaled
FIR13-00639 INSP-Supply line flush4/28/20144/29/20144/29/2014 3:37:25 PMPPASS
Underground Flush passed. Also performed a rough-in and found that the only real issue other than final inspection items is the lack of seismic bracing on all of the branchlines. Per the plans the piping was to be installed without per the exception of chapter 9 but was run at a lower elevation.
FIR12-00717 INSP-Sprinkler Rough-in4/29/20144/29/20144/29/2014 3:35:22 PMPPASS
See the city approved plans for locations where tile can be installed.
BLD14-00293 FIRE-Conference4/28/20144/29/20144/29/2014 2:16:11 PMADONE
Went over fire extinguisher requirements with the contractor.
BLD12-03121 FIRE-Final Inspection4/29/20144/29/20144/29/2014 2:15:34 PMAPASS
Life safety passed
BLD13-00854 FIRE-Final Inspection4/28/20144/29/20144/29/2014 8:10:01 AMAPASS
life safety passed
BLD13-01315 FIRE-Final Inspection4/28/20144/29/20144/29/2014 8:07:26 AMAPASS
Life safety passed
BLD12-03289 FIRE-Final Inspection4/28/20144/29/20144/29/2014 7:51:42 AMAPASS
life safety passed