FIR11-00096
| FIR-Aging Inspection | 4/29/2014 | 4/29/2014 | 5/7/2014 7:26:24 AM | | NR |
|
|
I spoke to Brian about getting this permit finaled
|
FIR13-00639
| INSP-Supply line flush | 4/28/2014 | 4/29/2014 | 4/29/2014 3:37:25 PM | P | PASS |
|
|
Underground Flush passed. Also performed a rough-in and found that the only real issue other than final inspection items is the lack of seismic bracing on all of the branchlines. Per the plans the piping was to be installed without per the exception of chapter 9 but was run at a lower elevation.
|
FIR12-00717
| INSP-Sprinkler Rough-in | 4/29/2014 | 4/29/2014 | 4/29/2014 3:35:22 PM | P | PASS |
|
|
See the city approved plans for locations where tile can be installed.
|
BLD14-00293
| FIRE-Conference | 4/28/2014 | 4/29/2014 | 4/29/2014 2:16:11 PM | A | DONE |
|
|
Went over fire extinguisher requirements with the contractor.
|
BLD12-03121
| FIRE-Final Inspection | 4/29/2014 | 4/29/2014 | 4/29/2014 2:15:34 PM | A | PASS |
|
|
Life safety passed
|
BLD13-00854
| FIRE-Final Inspection | 4/28/2014 | 4/29/2014 | 4/29/2014 8:10:01 AM | A | PASS |
|
|
life safety passed
|
BLD13-01315
| FIRE-Final Inspection | 4/28/2014 | 4/29/2014 | 4/29/2014 8:07:26 AM | A | PASS |
|
|
Life safety passed
|
BLD12-03289
| FIRE-Final Inspection | 4/28/2014 | 4/29/2014 | 4/29/2014 7:51:42 AM | A | PASS |
|
|
life safety passed
|