Inspections for the day of: Wednesday, April 29, 2015.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorKatie Marron
TitleFIRE INSPECTOR
Phone #395-7809
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR14-00708 INSP-Sprinkler Rough-in4/29/20154/29/20154/29/2015 4:40:41 PMPPART
Hard lids only at 3rd floor hallway and common room ok to cover. Advised that current drops for drop ceiling areas look overspaced, contractor to adjust as needed before RTC for drop ceiling. Storage room by elevator still pending a sprinkler drop.
FIR14-00869 INSP-Final Inspection4/29/20154/29/20154/29/2015 1:39:07 PMPPASS
Scope of work complete. Permit Finaled
FIR14-00815 INSP-Sprinkler Rough-in4/29/20154/29/20154/29/2015 12:21:11 PMPPART
Tenting inspection complete 4th floor, sec 2 living units only with the exception of RMs 414, 415, 416 to be inspected at a later date.

The following correction notice items were fixed on the spot:
Rm 408 pipe in contact with exhaust vent pipe, supplied insulation between
Rm 412 pipe in contact with exhaust vent pipe in two spots, supplied insulation between.
Rms 413, 411 and 406 had sections unfinished, completed by end of inspection.
BLD15-00799 FIRE-Final Inspection4/29/20154/29/20154/29/2015 10:25:51 AMPPASS
Fire life safety Pass.
FIR14-00917 INSP-Final Inspection4/28/20154/29/20154/29/2015 9:29:48 AMAPASS
Scope of work complete. Permit Finaled.
FIR14-00869 INSP-Supply line flush4/28/20154/29/20154/29/2015 9:29:05 AMAPASS
Scope of work complete. Flush of underground completed. Permit Finaled.