ESC14-00848
| General Inspection | 4/29/2015 | 4/29/2015 | 4/29/2015 4:00:08 PM | | CANC |
|
|
rescheduled 4/30
|
ESC14-00614
| General Inspection | 4/29/2015 | 4/29/2015 | 4/29/2015 3:59:53 PM | | CANC |
|
|
rescheduled 4/30
|
ESC14-00763
| Aging Inspection | 4/29/2015 | 4/29/2015 | 4/29/2015 3:49:33 PM | | PASS |
|
|
|
ESC14-00481
| DOC - Permit Finaled | 4/29/2015 | 4/29/2015 | 4/29/2015 2:37:26 PM | P | PASS |
|
|
|
ESC14-00481
| Aging Inspection | 4/29/2015 | 4/29/2015 | 4/29/2015 2:37:07 PM | | PASS |
|
|
Project complete and landscaped. Backyard parking area stabilized. ESC permit conditions met.
|
ESC15-00094
| General Inspection | 4/29/2015 | 4/29/2015 | 4/29/2015 1:20:05 PM | P | PART |
|
|
WIP. Preparing
Requesting that sediment containment BMPs or check dams be used to treat runoff down Windsong. Receiving DI on Windsong needs new inlet protection.
No significant trackout or fugitive dust occuring. Need to prepare bottom of site for rain events to treat sediment runoff.
|
ESC14-00360
| General Inspection | 4/29/2015 | 4/29/2015 | 4/29/2015 12:48:40 PM | | PEND |
|
|
Still not landscaped/stabilized. No sediment leaving site though. Some minor work on the landscaping is in progress. Vegetation has started to grow in between dirt stockpile and curbing...
|
ESC14-00351
| Aging Inspection | 4/29/2015 | 4/29/2015 | 4/29/2015 12:21:34 PM | | PASS |
|
|
Mill District townhome complete and landscaped. Trash and building materials have been clean. DI in alley will keep filter bag until adjacent projects are complete. ESC permit conditions satisfied.
|
ESC14-00351
| DOC - Permit Finaled | 4/29/2015 | 4/29/2015 | 4/29/2015 12:17:13 PM | P | PASS |
|
|
|
ESC14-01001
| DOC - Permit Finaled | 4/29/2015 | 4/29/2015 | 4/29/2015 12:12:19 PM | P | PASS |
|
|
East Valley home complete. Site cleaned, landscaped, and stabilized. ESC permit conditions satisfied. Temp BMPs to remain for ongoing SFH construction on Boven
|
ESC14-01005
| DOC - Permit Finaled | 4/29/2015 | 4/29/2015 | 4/29/2015 12:09:21 PM | P | PASS |
|
|
East Valley home complete. Site cleaned, landscaped, and stabilized. ESC permit conditions satisfied. Temp BMPs to remain for ongoing SFH construction on Sky Bar.
|
ESC14-00937
| DOC - Permit Finaled | 4/29/2015 | 4/29/2015 | 4/29/2015 12:08:42 PM | P | PASS |
|
|
East Valley home complete. Site cleaned, landscaped, and stabilized. ESC permit conditions satisfied. Temp BMPs to remain for ongoing SFH construction on Sky Bar.
|
ESC14-01027
| DOC - Permit Finaled | 4/29/2015 | 4/29/2015 | 4/29/2015 12:08:17 PM | P | PASS |
|
|
East Valley home complete. Site cleaned, landscaped, and stabilized. ESC permit conditions satisfied. Temp BMPs to remain for ongoing SFH construction on Sky Bar.
|
ESC14-00938
| DOC - Permit Finaled | 4/29/2015 | 4/29/2015 | 4/29/2015 12:07:45 PM | P | PASS |
|
|
East Valley home complete. Site cleaned, landscaped, and stabilized. ESC permit conditions satisfied. Temp BMPs to remain for ongoing SFH construction on Sky Bar.
|
ESC14-00950
| DOC - Permit Finaled | 4/29/2015 | 4/29/2015 | 4/29/2015 12:07:04 PM | A | PASS |
|
|
East Valley home complete. Site cleaned, landscaped, and stabilized. ESC permit conditions satisfied. Temp BMPs to remain for ongoing SFH construction on Sky Bar.
|
ESC14-00951
| DOC - Permit Finaled | 4/29/2015 | 4/29/2015 | 4/29/2015 12:06:30 PM | P | PASS |
|
|
East Valley home complete. Site cleaned, landscaped, and stabilized. ESC permit conditions satisfied. Temp BMPs to remain for ongoing SFH construction on Sky Bar.
|
ESC14-00144
| General Inspection | 4/29/2015 | 4/29/2015 | 4/29/2015 12:01:33 PM | | PASS |
|
|
East Valley SFHs in progress. Subdivision BMPs installed and no maintenance needed at this time. No grading or other action -- no fugitive dust observed. First 6 homes on Sky Bar are now complete and landscaped.
|
ESC14-00588
| Random Inspection | 4/29/2015 | 4/29/2015 | 4/29/2015 11:31:02 AM | A | PEND |
|
|
Site grubbing and initial grading has started. Discussed operations with superindendent Igor with ESI and Mike with Spiers Construction. Conducted full site walk through.
Silt fence perimeter lines the river channel to the southwest of the site. Silt fence is wire backed and properly trenched in. There is a 30-45 ft vegetative buffer along the stream channel.
There is a irrigation ditch the runs to a holding pond at southwest corner of site. It does not discharge into stream channel. ESI/Spiers working with irrigation district to use water for dust suppression and other needs. No trackout or significant dust issues yet, but requested:
1. Install construction entrances (x2). Scheduled for tomorrow. 2. Water truck needs to be onsite for fugitive dust control. Requested that should be on site this afternoon/ASAP. Some small plumes of dust intermittently cross Parkcenter and today is windy. 3. Mike from Spiers is going to call me to inspect secondary containment area for equipment fueling station. I stated needs to contain 110% volume of tank and being lined. Mike will like it with vapor barrier and cover with 3" sandy soils to avoid puncture.
Approved to proceed with operations. Status pending based on water truck and construction entrances.
|
ESC15-00183
| Site Preparation | 4/28/2015 | 4/29/2015 | 4/29/2015 10:11:40 AM | A | PASS |
|
|
Vedad Phone #: ###-####
Permit posted. Small excavation for covered patio structure. Flat lot, gravel surface receives any runoff.
Approved to start project.
|
ESC14-00908
| General Inspection | 4/29/2015 | 4/29/2015 | 4/29/2015 9:48:28 AM | | PASS |
|
|
Well treatment plant is in progress. Well building is mostly complete. Grounds and parking area are still undeveloped. Construction rock is placed at the entrance to prevent trackout.
No discharges or sediment leaving site. Materials and waste is contained, no dust or other issues. No corrections needed at this time.
|
ESC15-00142
| General Inspection | 4/29/2015 | 4/29/2015 | 4/29/2015 9:12:53 AM | P | PASS |
|
|
Construction entrance has been installed as requested 4/21 . RP explained concrete washout containers will be brought on site once foundation and paving work begins. Site BMPs are in good condition. Approved.
|
ESC14-00807
| General Inspection | 4/29/2015 | 4/29/2015 | 4/29/2015 8:43:50 AM | | PASS |
|
|
TI and sawcutting for plumbing complete. ESC permit conditions satisfied.
|
ESC14-00807
| DOC - Permit Finaled | 4/29/2015 | 4/29/2015 | 4/29/2015 8:42:09 AM | P | PASS |
|
|
|