Inspections for the day of: Friday, April 29, 2016.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD16-00541 FIRE-Final Inspection4/28/20164/29/20164/29/2016 2:09:04 PMAPASS
No fire sprinklers, no fire alarms, fire extinguisher is on site, discussed with point of contact an acceptable location for extinguisher mount. Final life fire safety inspection complete.
BLD15-02706 FIRE-Final Inspection4/29/20164/29/20164/29/2016 11:43:02 AMPPASS
No fire alarms, one fire sprinkler located in compressed gas closet (Not associated with an FIR permit, sprinkler head is supplied by domestic water) fire extinguishers in place with current inspection tags. Thumb-turn deadbolt hardware on interior records room door will be removed. Final life fire safety inspection passed/complete.
BLD15-02657 FIRE-Final Inspection4/28/20164/29/20164/29/2016 10:43:26 AMAPASS
No fire sprinklers, no fire alarms, fire extinguishers are in place with current inspections, exit signs/egress lighting/discharge landing lighting verfied, all operated correctly. Final life fire safety inspection passed/complete.
BLD15-02530 FIRE-Final Inspection4/28/20164/29/20164/29/2016 10:42:53 AMAPASS
No fire sprinklers, no fire alarms, fire extinguishers are in place with current inspections, exit signs/egress lighting/discharge landing lighting verfied, all operated correctly. Final life fire safety inspection passed/complete.
FIR16-00106 INSP-Sprinkler Rough-in/Hydro4/28/20164/29/20164/29/2016 10:11:37 AMAPASS
200 psi hydrostatic test for overhead fire sprinkler piping complete. Rough in inspection for shell protection complete, end of line sway bracing was not installed at time of inspection, end of line sway bracing install will be verified at final fire sprinkler inspection.
FIR15-00806 INSP-Sprinkler Rough-in4/28/20164/29/20164/29/2016 10:03:08 AMPPART
200 psi hydrostatic test complete for level three, this completes the hydrostatic testing for this building. Rough in inspection complete for level 3, tenting insulation for overhead fire sprinkler piping, north of the fire doors complete. Hardlids north of the fire doors approved for cover. Remaining cover inspection for overhead fire sprinkler tenting south of the fire doors will be scheduled when insulation install is complete.
FIR16-00017 INSP-Sprinkler Rough-in/Hydro4/25/20164/29/20164/28/2016 11:46:01 AMPCANC
Please call when you are headed out. Thanks! Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello Inspection cancelled from web by: Anthony Minichiello