BLD18-03923
| BLD-Conference | 4/26/2019 | 4/26/2019 | | P | |
|
|
|
BLD18-03684
| BLD-Ceiling Grid Inspection | 4/26/2019 | 4/29/2019 | 4/29/2019 5:30:15 PM | P | NR |
|
|
Bryan Phone #: ###-####. Needs sprinkler rough in inspection first.
|
BLD18-03923
| BLD-Conference | 4/29/2019 | 4/29/2019 | 4/29/2019 3:02:09 PM | P | DONE |
|
|
The correct fire caulking on 1st. floor has now been used.
|
BLD19-00947
| BLD-Final | 4/29/2019 | 4/29/2019 | 4/29/2019 3:01:38 PM | P | PART |
|
|
Randy Phone #: ###-####. Ok for temp occ. Neeeds to provide 34inch max counter in breakroom.
|
BLD19-00028
| BLD-Final | 4/29/2019 | 4/29/2019 | 4/29/2019 3:00:52 PM | P | PASS |
|
|
Randy Phone #: ###-####
|
BLD19-00028
| DOC - Permit Finaled | 4/29/2019 | 4/29/2019 | 4/29/2019 3:00:43 PM | P | PASS |
|
|
|
BLD18-02795
| BLD-Framing/Rough-in | 4/29/2019 | 4/29/2019 | 4/29/2019 2:21:13 PM | P | PASS |
|
|
chad Phone #: ###-####. Interior steel stud framed walls 1st. floor ok.
|
BLD18-01425
| BLD-Framing/Rough-in | 4/29/2019 | 4/29/2019 | 4/29/2019 1:51:42 PM | P | PASS |
|
|
James Phone #: ###-####. Interior steel stud framed walls for area H ok.
|
BLD19-00621
| BLD-Footing | 4/28/2019 | 4/29/2019 | 4/29/2019 1:51:01 PM | P | PART |
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo aggregate constru
|
BLD19-00595
| BLD-Footing | 4/28/2019 | 4/29/2019 | 4/29/2019 1:50:46 PM | P | PART |
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo aggregate constru
|
BLD19-00596
| BLD-Footing | 4/28/2019 | 4/29/2019 | 4/29/2019 1:50:32 PM | P | PART |
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo aggregate constru
|
ESC18-01270
| Site Final | 4/29/2019 | 4/29/2019 | 4/29/2019 1:29:14 PM | P | DONE |
|
|
|
ESC18-01270
| DOC - Permit Finaled | 4/29/2019 | 4/29/2019 | 4/29/2019 1:29:06 PM | P | PASS |
|
|
|
BLD18-03185
| BLD-Final | 4/29/2019 | 4/29/2019 | 4/29/2019 1:28:56 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by David Scaggs
|
BLD18-03185
| DOC - Permit Finaled | 4/29/2019 | 4/29/2019 | 4/29/2019 1:28:48 PM | P | PASS |
|
|
|
BLD18-03185
| BLD-Blower Door Test Results | 4/29/2019 | 4/29/2019 | 4/29/2019 1:28:40 PM | P | DONE |
|
|
4.4ACH @50 pa.
|
BLD19-00397
| BLD-Foundation | 4/29/2019 | 4/29/2019 | 4/29/2019 1:21:52 PM | P | PASS |
|
|
Kile- have conrete at 2:30 please come by an hour before Phone #: ###-####
|
BLD18-03984
| BLD-Final | 4/26/2019 | 4/29/2019 | 4/29/2019 11:24:36 AM | A | DONE |
|
|
Inspection requested via web by Jordan Williams
|
BLD18-03984
| DOC - Permit Finaled | 4/29/2019 | 4/29/2019 | 4/29/2019 11:24:28 AM | P | PASS |
|
|
|
BLD18-01143
| BLD-Framing/Rough-in | 4/26/2019 | 4/29/2019 | 4/29/2019 10:30:14 AM | A | PASS |
|
|
David Phone #: ###-####. Ineterior steel stud framed walls for new tray wash room.
|
BLD18-00803
| BLD-Final | 4/26/2019 | 4/29/2019 | 4/29/2019 9:42:46 AM | A | CANC |
|
|
Kevin Phone #: ###-####
|
BLD18-01892
| BLD-Final | 4/26/2019 | 4/29/2019 | 4/29/2019 9:42:16 AM | A | CANC |
|
|
Kevin Phone #: ###-####
|
BLD19-00277
| BLD-Final | 4/26/2019 | 4/29/2019 | 4/29/2019 9:42:01 AM | A | CANC |
|
|
Kevin Phone #: ###-####
|
BLD18-01593
| BLD-Final | 4/26/2019 | 4/29/2019 | 4/29/2019 9:41:46 AM | A | CANC |
|
|
Kevin Phone #: ###-####
|
BLD18-03923
| BLD-Conference | 4/29/2019 | 4/29/2019 | 4/29/2019 9:17:19 AM | A | FAIL |
|
|
Noted that caulking used is a fire block and not a UL listed fire stop. Contractor to insatll correct materials and will reinspect this afternoon. A correction notice was also issued to fire stop all tub drains and plumbing penetrations for new lavs on the 3rd and 4th floors, to maintain the exisiting fire protection.
|
BLD19-00632
| BLD-Wall Bracing | 4/26/2019 | 4/29/2019 | 4/29/2019 8:48:14 AM | A | PASS |
|
|
Spencer Phone #: ###-####
|
BLD19-00623
| BLD-Final | 4/29/2019 | 4/29/2019 | | P | |
|
|
Preston Phone #: ###-####
|