BLD20-00440
| BLD-Final | 4/27/2020 | 4/29/2020 | 4/29/2020 1:47:59 PM | P | PASS |
|
|
Lloyd ***cleared** Phone #: ###-####
|
BLD20-00440
| DOC - Permit Finaled | 4/29/2020 | 4/29/2020 | 4/29/2020 1:47:48 PM | P | PASS |
|
|
Notified contractor that no occupancy was allowed under this permit. Appears that Sylvan learning center is goin to move in. A seperate permit is required for occupancy. A letter of completion was issued.
|
BLD20-00639
| BLD-Final | 4/29/2020 | 4/29/2020 | 4/29/2020 1:13:11 PM | P | PASS |
|
|
screened // Brandy Phone #: ###-####
|
BLD20-00639
| DOC - Permit Finaled | 4/29/2020 | 4/29/2020 | 4/29/2020 1:13:04 PM | P | PASS |
|
|
|
BLD18-01027
| BLD-Framing/Rough-in | 4/9/2020 | 4/29/2020 | 4/29/2020 12:49:38 PM | A | CANC |
|
|
|
BLD18-04519
| BLD-Framing/Rough-in | 4/29/2020 | 4/29/2020 | 4/29/2020 10:51:59 AM | A | NR |
|
|
Ceiling drops for cover in Building 10 (12 units), late as possible this morning. Phone #: ###-#### Inspection requested via web by Bob Goodwin. Stiil needs mech. rough in inspection. electrical rough in inspection has failed for all units.
|
BLD20-01178
| BLD-Framing/Rough-in | 4/29/2020 | 4/29/2020 | 4/29/2020 10:50:40 AM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Todd Landvatter. Interior steel stud framed walls ok. pending electrical rough in inspection.
|
BLD19-02464
| BLD-Energy code compliance | 4/28/2020 | 4/29/2020 | 4/29/2020 10:22:16 AM | A | PASS |
|
|
Ed *cleared* Phone #: ###-####. 2nd. floor North half.
|
BLD18-04318
| BLD-Ceiling Grid Inspection | 4/28/2020 | 4/29/2020 | 4/29/2020 9:36:35 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Clint Hogwood. Provide UL listed 1 hr. ceiling grid system in 1hr. corridors. Also appears that doors and glazing have been switched out and ratings not maintained. Also noted several apeas were grid system is not completed. Correction notice was issued.
|
BLD19-04980
| BLD-Foundation | 4/28/2020 | 4/29/2020 | 4/29/2020 8:42:41 AM | A | PART |
|
|
Gene Pour time at 12 Phone #: ###-####. East and west step footings and north footing line. Work in progress. ok to place concrete pending special inspection.
|
BLD19-00803
| BLD-Final | 4/27/2020 | 4/29/2020 | 4/28/2020 10:14:13 PM | A | CANC |
|
|
Hi Mike. Please give me some lead time so I can meet you onsite. Thanks Scott ###-#### Phone #: ###-#### >> Inspection requested via web by Scott Zierler Inspection cancelled from web by: Scott Zierler
|