ELE95-01918
| INSP - Final | 4/2/1996 | 4/3/1996 | 4/3/1996 12:00:00 AM | A | PASS |
|
|
04/02/96 336 - reinspection final Ok
|
ELE96-01010
| INSP - T/S and Final | 4/2/1996 | 4/3/1996 | 4/3/1996 12:00:00 AM | A | NR |
|
|
04/02/96 336 - not ready
|
ELE96-01016
| INSP - Electrical Rough-In | 4/2/1996 | 4/3/1996 | 4/3/1996 12:00:00 AM | A | PASS |
|
|
04/02/96 336 - SPACE 1057/1060 LOWER LEVEL-RELOCATION OF EXISTING FIXTUR FIXTURES, INSTALL OF FLOOR BOXES IN SLAB FOR CASH WRAP Partial R/I Ok
|
ELE96-01019
| INSP - Ele Rough-In/Perm Svc | 4/2/1996 | 4/3/1996 | 4/3/1996 12:00:00 AM | A | PASS |
|
|
04/02/96 336 - P/s & R/I Ok
|
ELE96-01022
| INSP - Ele Rough-In/Perm Svc | 4/3/1996 | 4/3/1996 | 4/3/1996 12:00:00 AM | P | PASS |
|
|
04/03/96 336 - p/s ok r/i ok
|
ELE96-01023
| INSP - T/S and Final | 4/3/1996 | 4/3/1996 | 4/3/1996 12:00:00 AM | P | PASS |
|
|
04/03/96 336 - T/s U/G Ok
|
ELE96-01031
| INSP - Final | 4/3/1996 | 4/3/1996 | 4/3/1996 12:00:00 AM | P | PASS |
|
|
04/03/96 336 - HOOK UP ALL ELECTRIC EQUIPMENT POLE WIRE COOKING EQUIPMEN WIRING EQUIPMENT-$3,750.00-BLD95-2243 final ok
|
ELE96-00391
| INSP - Final | 4/3/1996 | 4/3/1996 | 4/3/1996 12:00:00 AM | P | PASS |
|
|
04/03/96 336 - ROOMS 123,124,130 ALL THREE ARE OPEN GO TO FRONT DESK THE MAINTENCE MAN AND GET A KEY Final Ok
|
ELE96-00425
| INSP - Final | 4/3/1996 | 4/3/1996 | 4/3/1996 12:00:00 AM | P | CANC |
|
|
04/03/96 336 - Gave to Tom
|
ELE96-00749
| INSP - Electrical Rough-In | 4/3/1996 | 4/3/1996 | 4/3/1996 12:00:00 AM | P | PASS |
|
|
04/03/96 336 - FED FAB WALL ROUGH IN CONTACT RON OR TOM. Part R/I Ok
|
ELE96-00802
| INSP - Hot Tubs/Spas | 4/3/1996 | 4/3/1996 | 4/3/1996 12:00:00 AM | P | FAIL |
|
|
04/03/96 336 - SPA FOR THIS AFTERNOON disapproved bond to panel
|