MEC95-02099
| INSP - Final | 4/2/1996 | 4/3/1996 | 4/3/1996 12:00:00 AM | A | NR |
|
|
04/03/96 350 - 903
|
MEC95-02099
| INSP - Final | 4/2/1996 | 4/3/1996 | 4/3/1996 12:00:00 AM | A | NR |
|
|
04/03/96 350 - 903
|
MEC96-00141
| INSP - Final | 4/2/1996 | 4/3/1996 | 4/3/1996 12:00:00 AM | A | NR |
|
|
04/03/96 350 - SUITE 903
|
MEC96-00141
| INSP - Final | 4/2/1996 | 4/3/1996 | 4/3/1996 12:00:00 AM | A | NR |
|
|
04/03/96 350 - SUITE 903
|
MEC96-00965
| INSP - Retro Fit (check note) | 4/2/1996 | 4/3/1996 | 4/3/1996 12:00:00 AM | A | PASS |
|
|
04/03/96 350 - ###-####-RICK GEORGE-JAN PLEASE CALL FOR ACCESS ###-#### HIS WORK NUMBER FURNACE OK FINAL
|
MEC96-00970
| INSP - Rough-in & Gas Pressure | 4/3/1996 | 4/3/1996 | 4/3/1996 12:00:00 AM | P | FAIL |
|
|
04/03/96 350 - ROOM 1006 CORR-CORREC-CALL FOR REINSP WHEN COMPLETED NEED PRESSURE RELIEF VALVE IN GASLINE TO REDUCE DOWN FROM 2# SYSTEM. TALKED WITH JEFF AT WESTERN ABOU CONFERENCE
|
MEC96-00975
| INSP - Gas pressure test | 4/3/1996 | 4/3/1996 | 4/3/1996 12:00:00 AM | P | PASS |
|
|
04/03/96 350 - GAS PIPING OK #29316 FINAL
|
MEC95-02095
| INSP - Final | 4/3/1996 | 4/3/1996 | 4/3/1996 12:00:00 AM | P | PASS |
|
|
04/03/96 350 - FINAL
|
MEC95-02095
| INSP - Final | 4/3/1996 | 4/3/1996 | 4/3/1996 12:00:00 AM | P | PASS |
|
|
04/03/96 350 - FINAL
|