Inspections for the day of: Monday, April 3, 2000.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDixie Fellows
TitleMEC-COM/RES INSPECTOR
Phone #794-6208
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC00-01032 Rough-in3/31/20004/3/20004/3/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/31/2000 at 14:16:42. Contact: ###-####.
MEC00-00451 Final3/31/20004/3/20004/3/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/31/2000 at 14:54:32. Contact: ###-####.
MEC00-00214 Final3/31/20004/3/20004/3/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/31/2000 at 16:04:40. Contact: ###-####.
MEC00-00614 Final3/31/20004/3/20004/3/2000 12:00:00 AMAPASS
8147enter ###-####
MEC99-04152 Conference4/3/20004/3/20004/3/2000 12:00:00 AMAPART
Combustion air also taken from a horizontal joist cavity.
MEC99-04360 Pressure Test3/31/20004/3/20004/3/2000 12:00:00 AMPCANC
gas line to range only - ###-#### Disp set to [CANC] by a contractor via Hello! on 04/03/2000 at 08:29:14.
MEC00-00887 Pressure Test4/3/20004/3/20004/3/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 04/03/2000 at 08:40:21. Contact: ###-####.
MEC00-01047 Pressure Test4/3/20004/3/20004/3/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 04/03/2000 at 09:16:26. Contact: ###-####.
MEC00-01052 Final4/3/20004/3/20004/3/2000 12:00:00 AMPNH
###-#### CALLED PHONE #..NO ANSWER
MEC00-00421 Final4/3/20004/3/20004/3/2000 12:00:00 AMPPASS
first house on the left Advanced Heating ###-####
MEC00-01015 Final4/3/20004/3/20004/3/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 04/03/2000 at 11:08:16. Contact: ###-####. NEED SPECS ON OTHER F/P
MEC99-04152 Final4/3/20004/3/20004/3/2000 12:00:00 AMPPASS
Look just beyond the B vent and the compustion air will be there.... Lana ###-####