BLD01-00638
| BLD-Foundation | 4/2/2001 | 4/3/2001 | 4/3/2001 12:00:00 AM | A | PASS |
|
|
###-#### wall insp
|
MEC00-00934
| Final | 4/2/2001 | 4/3/2001 | 4/3/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/02/2001 at 13:51:09. Contact: ###-####.
|
BLD00-02543
| BLD-Framing/Rough-in | 4/2/2001 | 4/3/2001 | 4/3/2001 12:00:00 AM | A | FAIL |
|
|
###-#### C/N posted on site. 4/3/2001 11:46:53 AM
|
MEC01-00180
| Final | 3/30/2001 | 4/3/2001 | 4/3/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/30/2001 at 15:06:12. Contact: ###-####.
|
BLD01-00018
| BLD-Framing/Rough-in | 4/2/2001 | 4/3/2001 | 4/3/2001 12:00:00 AM | A | FAIL |
|
|
Bryan ###-#### C/N posted on site 4/3/2001 10:03:34 AM
|
BLD00-03604
| BLD-Framing/Rough-in | 4/2/2001 | 4/3/2001 | 4/3/2001 12:00:00 AM | A | PART |
|
|
###-#### shear C/N issued--Shear 4/3/2001 9:07:30 AM
|
BLD00-02026
| BLD-Framing/Rough-in | 4/3/2001 | 4/3/2001 | 4/3/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 420 On 4/3/2001 8:21:51 AM Pool Area -- ok to cover. 4/3/2001 8:36:01 AM
|
MEC01-00456
| Final | 4/3/2001 | 4/3/2001 | 4/3/2001 12:00:00 AM | P | NR |
|
|
Jerry Bunch ###-#### c/n posted-no access, call for re-inspection. 4/5/2001 2:12:59 PM
|
BLD00-03607
| BLD-Framing/Rough-in | 4/3/2001 | 4/3/2001 | 4/3/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 04/03/2001 at 09:22:01. Contact: ###-####. C/N posted-ok to insulate. 4/3/2001 2:21:18 PM
|
MEC01-00517
| Rough-in | 4/3/2001 | 4/3/2001 | 4/3/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/03/2001 at 10:08:08. Contact: ###-####.
|
MEC01-00883
| Rough-in | 4/3/2001 | 4/3/2001 | 4/3/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/03/2001 at 10:41:11. Contact: ###-####.
|
BLD01-00715
| BLD-Footing | 4/2/2001 | 4/3/2001 | 4/3/2001 12:00:00 AM | P | PASS |
|
|
late pm ###-####. 4/3/2001 3:46:40 Pm--2-#4 rebar contineous with #4 bar verticals max. 6' o.c. 4/3/2001 3:49:43 PM
|
BLD01-00083
| BLD-Framing/Rough-in | 4/2/2001 | 4/3/2001 | 4/3/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/02/2001 at 11:46:39. Contact: ###-####. Ok to insulate 4/3/2001 3:24:16 PM
|
BLD01-00324
| BLD-Framing/Rough-in | 4/2/2001 | 4/3/2001 | 4/3/2001 12:00:00 AM | P | PASS |
|
|
Doug ###-#### ok to insulate pending electrical r.i. 4/3/2001 1:05:40 PM
|
BLD01-00083
| BLD-Framing/Rough-in | 3/30/2001 | 4/3/2001 | 4/2/2001 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 03/30/2001 at 08:00:18. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 04/02/2001 at 11:43:44.
|