MEC02-00841
| Rough-in | 4/2/2002 | 4/3/2002 | 4/3/2002 12:00:00 AM | A | FAIL |
|
|
###-#### ALAN plans not on site 4/3/2002 9:45:50 AM
|
MEC02-00883
| Conference | 4/2/2002 | 4/3/2002 | 4/3/2002 12:00:00 AM | A | PASS |
|
|
###-#### PATTY conference on gas pipe below concrete floor 4/3/2002 9:02:45 AM
|
MEC02-00488
| Pressure Test | 4/3/2002 | 4/3/2002 | 4/3/2002 12:00:00 AM | A | FAIL |
|
|
not sized correct test fail 4/3/2002 11:29:13 AM
|
MEC02-00492
| Final | 4/3/2002 | 4/3/2002 | 4/3/2002 12:00:00 AM | P | NR |
|
|
###-#### JOHN complete f/p gas and trim out 4/3/2002 2:02:28 PM
|
MEC02-00869
| Pressure Test | 4/3/2002 | 4/3/2002 | 4/3/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 04/03/2002 at 07:37:38. Contact: ###-####.
|
MEC02-00158
| Final | 4/3/2002 | 4/3/2002 | 4/3/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/03/2002 at 09:31:26. Contact: ###-####.
|
MEC02-00875
| Pressure Test | 4/3/2002 | 4/3/2002 | 4/3/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 04/03/2002 at 09:36:55. Contact: ###-####. underground gas ok 4/3/2002 2:01:25 PM
|