BLD01-03150
| BLD-Final | 4/2/2002 | 4/3/2002 | 4/3/2002 12:00:00 AM | A | FAIL |
|
|
FN ###-####- DAVID
c/n posted 4/3/2002 11:50:03 AM
|
BLD02-00303
| BLD-Energy code compliance | 4/2/2002 | 4/3/2002 | 4/3/2002 12:00:00 AM | A | PASS |
|
|
###-#### SCOTT
make sure r-48 in ceiling at final 4/3/2002 11:34:48 AM
|
BLD02-00571
| BLD-Framing/Rough-in | 4/2/2002 | 4/3/2002 | 4/3/2002 12:00:00 AM | A | PASS |
|
|
###-####
ok to insulate and cover, ,,, verify temp glass by door at final 4/3/2002 11:11:13 AM
|
BLD01-02828
| BLD-Foundation | 4/2/2002 | 4/3/2002 | 4/3/2002 12:00:00 AM | A | PART |
|
|
late am ###-####
wip 4/3/2002 12:48:14 PM
|
BLD02-00461
| BLD-Foundation | 4/2/2002 | 4/3/2002 | 4/3/2002 12:00:00 AM | A | PART |
|
|
wall\\###-####
|
BLD02-00015
| BLD-Framing/Rough-in | 4/2/2002 | 4/3/2002 | 4/3/2002 12:00:00 AM | P | PART |
|
|
FR INSP --KEITH ###-####
ok to cover after mech. signs off 4/3/2002 3:09:27 PM
|
BLD00-03627
| BLD-Final | 4/3/2002 | 4/3/2002 | 4/3/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/03/2002 at 08:12:23. Contact: ###-####.ok for c of c after sign-off from public works on hillside. 4/3/2002 3:08:45 PM
|
BLD02-00235
| BLD-Framing/Rough-in | 4/3/2002 | 4/3/2002 | 4/3/2002 12:00:00 AM | P | FAIL |
|
|
fr insp mike -###-#### PLEASE CALL FOR ACCESS
c/n posted 4/3/2002 3:23:08 PM
|
BLD02-00362
| BLD-Footing | 4/3/2002 | 4/3/2002 | 4/3/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 04/03/2002 at 10:04:09. Contact: ###-####.
|