MEC07-00931
| Pressure Test | 4/2/2007 | 4/3/2007 | 4/3/2007 4:25:28 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 4/2/2007 at 11:43:24 PM. Contact: ###-####. 4-20# tests ok
|
MEC07-00931
| Rough-in | 4/2/2007 | 4/3/2007 | 4/3/2007 4:24:56 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 4/2/2007 at 11:42:42 PM. Contact: ###-####. 4- ri ok 4-fp ok 4-20# tests ok
|
MEC07-00930
| Rough-in | 4/2/2007 | 4/3/2007 | 4/3/2007 4:24:10 PM | P | PASS |
|
|
Fireplace and Gas Pressure for building Phone #: ###-#### 4-fire places, 4-20# tests ok, ri ok
|
MEC07-00919
| Pressure Test | 4/3/2007 | 4/3/2007 | 4/3/2007 4:22:42 PM | P | PASS |
|
|
4-20# tests ok
|
MEC06-02953
| Final | 4/3/2007 | 4/3/2007 | 4/3/2007 2:23:02 PM | P | PASS |
|
|
final ok
|
MEC06-02953
| Rough-in | 4/3/2007 | 4/3/2007 | 4/3/2007 2:22:33 PM | P | CANC |
|
|
lester; Phone #: ###-#### Internet Inspection Request from: Victoria Beall this is a FINAL
|
MEC06-02056
| Final | 4/3/2007 | 4/3/2007 | 4/3/2007 2:21:26 PM | P | CANC |
|
|
|
MEC07-00919
| Rough-in | 4/3/2007 | 4/3/2007 | 4/3/2007 2:20:16 PM | P | PASS |
|
|
|
MEC07-00929
| Rough-in | 4/3/2007 | 4/3/2007 | 4/3/2007 1:58:56 PM | P | FAIL |
|
|
mike ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith insulation and vapor barrier required on supply fittings in the attic. 20# test ok.
|
MEC07-00919
| Rough-in | 4/2/2007 | 4/3/2007 | 4/3/2007 11:41:53 AM | A | FAIL |
|
|
Fireplace inspection & gas pressure Phone #: ###-#### test failed north west unit talked to gas piper
|
PLM07-00995
| Sprinkler (Final) | 4/2/2007 | 4/3/2007 | 4/3/2007 8:15:43 AM | P | PART |
|
|
ADAM; Phone #: ###-#### Internet Inspection Request from: Darla Downs dcva tested but need the plumber to make corrections to the tie in in the crawl space.
|
PLM07-00985
| Final | 4/2/2007 | 4/3/2007 | 4/2/2007 4:44:01 PM | A | PASS |
|
|
Nancy ; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|