BLD07-01736
| BLD-Foundation | 4/3/2008 | 4/3/2008 | 4/4/2008 8:53:11 AM | P | PASS |
|
|
mike Phone #: ###-####
|
BLD08-00427
| BLD-Final | 4/3/2008 | 4/3/2008 | 4/3/2008 4:07:32 PM | P | FAIL |
|
|
maintane 1 hr walls and door assemlies with smoke seals at two boiller locations/ handrails at main stair 12 extentions with returns/ landing outside for exit stair door/ rated access cover on vale in pool boiller.
|
BLD07-03136
| BLD-Other | 4/2/2008 | 4/3/2008 | 4/3/2008 3:03:07 PM | P | PASS |
|
|
dan Note: roof nailing Phone #: ###-####
|
BLD08-00012
| BLD-Aging Inspection | 4/3/2008 | 4/3/2008 | 4/3/2008 9:33:29 AM | | NR |
|
|
pending ele
|
BLD08-00127
| BLD-Framing/Rough-in | 4/2/2008 | 4/3/2008 | 4/3/2008 9:32:09 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 4/2/2008 at 4:36:35 PM. Contact: ###-####. walls ok/ fire stopping at office soffit required.
|
BLD07-03125
| BLD-Framing/Rough-in | 4/2/2008 | 4/3/2008 | 4/3/2008 9:30:34 AM | A | PART |
|
|
steve Phone #: ###-#### repair fire walls at upper pick points to maintane ratting/ fire blk. stairs at unusable space. ok to insulate.
|
BLD07-03124
| BLD-Framing/Rough-in | 4/2/2008 | 4/3/2008 | 4/3/2008 9:30:05 AM | A | PART |
|
|
steve Phone #: ###-#### repair fire walls at upper pick points to maintane rating/ fire blk. stairs at unusable space. ok to insulate.
|
BLD07-03126
| BLD-Framing/Rough-in | 4/2/2008 | 4/3/2008 | 4/3/2008 9:29:19 AM | A | PART |
|
|
steve Phone #: ###-#### repair fire walls at upper pick points to maintane ratting/ fire blk. stairs at unusable space. ok to insulate.
|