FIR12-00647
| FIR-Aging Inspection | 4/3/2013 | 4/3/2013 | 4/8/2013 7:51:33 AM | | DONE |
|
|
Permit finaled
|
BLD13-00609
| FIRE-Final Inspection | 4/3/2013 | 4/3/2013 | 4/4/2013 5:10:54 PM | P | PASS |
|
|
C/N items completed, life safety passed.
|
FIR13-00011
| INSP-Sprinkler Rough-in | 4/3/2013 | 4/3/2013 | 4/3/2013 5:37:42 PM | P | PART |
|
|
Regarding noted C/N items
|
FIR12-00108
| INSP-Sprinkler Rough-in | 4/3/2013 | 4/3/2013 | 4/3/2013 5:36:46 PM | P | PART |
|
|
Coverage adjustments at the first floor office areas NW corner completed. Pendent heads changed to QR with the exception of the electrical room and one adjacent open office.
|
FIR12-00721
| INSP-Sprinkler Rough-in | 4/3/2013 | 4/3/2013 | 4/3/2013 5:31:37 PM | A | PART |
|
|
Reinspection for C/N items
|
BLD12-02771
| FIRE-Final Inspection | 4/2/2013 | 4/3/2013 | 4/3/2013 5:29:35 PM | A | FAIL |
|
|
Correction items include; provide approved hardware at the front and back exit doors, post "door to remain...." signage, remove the gate at the interior stairway.
|
FIR13-00114
| INSP-Final Inspection | 4/2/2013 | 4/3/2013 | 4/3/2013 12:46:38 PM | A | PART |
|
|
Scope of work completed, however the plan modification could not be located on site. Also need to replace ceiling tile and provide access at one location as discussed.
|