PLM14-00847
| Final | 4/2/2014 | 4/3/2014 | 4/3/2014 5:07:50 PM | P | PASS |
|
|
PLEASE CALL TO CONFIRM WE ARE READY FOR INSPECTION Phone #: ###-#### >> Inspection requested via web by DANIELLE BROOKSHIRE partial sewer replacement final ok. from house to gate to alley apx 35 feet to the alley. draining but slow, may need to pull sewer under building to stub in future.
|
MEC10-03631
| Final | 4/2/2014 | 4/3/2014 | 4/3/2014 12:47:32 PM | A | PASS |
|
|
After 10 please call ahead - Dwaine Phone #: ###-####
|
PLM14-00851
| Final | 4/3/2014 | 4/3/2014 | 4/3/2014 9:48:41 AM | A | PASS |
|
|
|
PLM14-00851
| Water and/or Sewer | 4/2/2014 | 4/3/2014 | 4/3/2014 9:47:32 AM | A | PASS |
|
|
>> Inspection requested via web by Bob Bivin Talked to Bill with Meridian Plumbing they will take responsibility for the connection inside the building under Bob's permit.
|
PLM14-00798
| Water and/or Sewer | 4/2/2014 | 4/3/2014 | 4/3/2014 9:24:39 AM | A | FAIL |
|
|
water line Phone #: ###-#### >> Inspection requested via web by Ashleigh Meligan 36" min bury depth, pvc fip maynot be installed with metal mip, leaks.
|
MEC14-01115
| Pressure Test | 4/3/2014 | 4/3/2014 | 4/3/2014 8:28:51 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Dustin Rich 20# gas test ok
|