FIR13-00713
| INSP-Sprinkler Rough-in | 4/2/2014 | 4/3/2014 | 4/3/2014 4:46:25 PM | P | PART |
|
|
Verified tenting and insulation at the third floor. Need adjustment above pendent head in the east end unit bedroom as discussed. Remainder okayed for cover.
|
BLD13-03142
| FIRE-Final Inspection | 3/27/2014 | 4/3/2014 | 4/3/2014 11:54:22 AM | A | FAIL |
|
|
Noted items include; obstructed sprinkler head at a storage closet below the warehouse managers office, missing coverage at a mezzanine storage room, need to verify fire protection at the accounts storage closet, overspaced coverage at the hall adjacent to the break room, need to provide a letter stating the existing fire sprinkler system is adequate for the protected hazard, revise door hardware at four warehouse exits and the main entry/exit, cover exposed wiring at the storage room light fixture, adjust directional arrows at exit signs. A racking permit will be necessary for storage over 8'. Refer to plan review documents for details.
|