BLD13-01571
| BLD-Other | 4/3/2014 | 4/3/2014 | 4/3/2014 3:02:46 PM | P | PART |
|
|
in the basement for fire rated corridor, plans are in corner cabinet // Troy Phone #: ###-####. Needs to firecailk electrical penetrations.
|
BLD10-00644
| BLD-Final | 4/2/2014 | 4/3/2014 | 4/3/2014 2:17:30 PM | P | PASS |
|
|
Dwaine Phone #: ###-####
|
BLD10-00644
| DOC - Permit Finaled | 4/3/2014 | 4/3/2014 | 4/3/2014 2:17:21 PM | P | PASS |
|
|
|
GCB14-00020
| GCB-Fndatn/slab ins/fld vent | 4/1/2014 | 4/3/2014 | 4/3/2014 1:30:26 PM | P | NR |
|
|
###-####. No one on site. Pad is excavated. No forms or property lines in place. Will need to reschedule.
|
BLD14-00641
| BLD-Footing | 4/2/2014 | 4/3/2014 | 4/3/2014 11:47:57 AM | A | PASS |
|
|
Jimmy Phone #: ###-####
|
BLD14-00106
| BLD-Final | 4/3/2014 | 4/3/2014 | 4/3/2014 9:01:32 AM | A | FAIL |
|
|
Spoke with Mike yesterday about canceling and re-scheduling for today between 8:00am and 9:00am. He alleviated that this was acceptable. Feel free to notify me if anything changes. Phone #: ###-#### >> Inspection requested via web by Antonio Carone. Provide code comlpiant handrails and provide edge protection at ramps on data floor.
|