Inspections for the day of: Friday, April 3, 2015.
Number of inspections: 23
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC14-00996 Aging Inspection4/3/20154/3/20154/3/2015 4:24:44 PM PASS
Parking lot overlay complete. Site cleaned, temp BMPs removed. ESC permit finaled
ESC14-00996 DOC - Permit Finaled4/3/20154/3/20154/3/2015 4:20:47 PMPPASS
ESC14-00656 General Inspection4/3/20154/3/20154/3/2015 3:10:44 PM PART
WIP. Storm drains (private and MS4) have inlet protection. Parking lot already paved, no trackout or discharges.

Correction:
Sweep up loose sediment in parking lot to prevent transport offsite.
ESC14-01006 Aging Inspection4/3/20154/3/20154/3/2015 2:31:20 PM PASS
Parking lot resurfacing complete. All temp BMPs removed and site was cleaned. ESC permit closed.
ESC14-01006 DOC - Permit Finaled4/3/20154/3/20154/3/2015 2:29:26 PMPPASS
ESC14-00662 General Inspection4/3/20154/3/20154/3/2015 1:07:02 PM PASS
DH#12 now has individual homes in progress. Washout and other BMPs installed. No sediment runoff or trackout issues. The stormwater ponde is still not complete nor stabilized. Subdivision development work inactive at this time.
ESC15-00320 Random Inspection4/3/20154/3/20154/3/2015 12:15:00 PMPPASS
Work is temporarily on hold. First section of biosolids has been moved and set out to dry. Work will continue again in a week or two per RP Shane. Permit is posted. No issues on site. Approved.
ESC15-00093 DOC - Permit Finaled4/3/20154/3/20154/3/2015 12:08:24 PMPPASS
Home construction complete and is occupied. Site has been cleaned and landscaped. No ESC corrective actions needed, active projects with permits ongoing in Mill District Square.
ESC14-00958 Aging Inspection4/3/20154/3/20154/3/2015 12:06:10 PM PASS
Home construction complete. West side of home is landscaped stabilzed. The east has active home in progress and will be landscaped upon completion. No sediment leaving site. No further ESC inspections needed.
ESC14-00958 DOC - Permit Finaled4/3/20154/3/20154/3/2015 12:05:08 PMPPASS
ESC14-00958 DOC - Permit Finaled4/3/20154/3/20154/3/2015 12:03:55 PMPPASS
ESC14-00753 DOC - Permit Finaled4/3/20154/3/20154/3/2015 12:01:51 PMPPASS
Construction complete, home occupied. Site has been cleaned and yard stabilized with bark mulch, bushes, and trees. DI bags to remain in inlets as work on nearby homes continues. ESC conditions met.
ESC15-00259 Site Preparation4/2/20154/3/20154/3/2015 11:44:30 AMANR
Clint Phone #: ###-####

Subdivision BMPs installed properly- lot is ready for excavation.

Correction: need to post yellow ESC permit sign
ESC15-00232 Site Preparation4/2/20154/3/20154/3/2015 11:41:36 AMAPASS
Clint Phone #: ###-####

DH#12 BMPs installed (DI protection, lined concrete washout) and permits posted. Active projects are in compliance.

Note: called A Company to report the tipped over porta pot on Wolf Tree & Barnside. No spill of material and fortunately was a newly placed unit.
ESC15-00238 Site Preparation4/3/20154/3/20154/3/2015 11:35:15 AMPPASS
Phone #: ###-#### Inspection requested via web by Austin Wagner

Permit posted. Active Hunter projects are in good condition. Concrete trucks still utilizing the washout in Harris Crossing. As activity increases an onsite Hunter Homes washout will be requested
ESC14-00956 General Inspection4/3/20154/3/20154/3/2015 10:35:12 AM PASS
4-plex complete. Site has been landsca ped/stabilized and cleaned. ESC permit conditions stabilized.

Note - carport is complete, ESC fees paid but permits not issued...see BLD15-00521
ESC14-00956 DOC - Permit Finaled4/3/20154/3/20154/3/2015 10:31:50 AMPPASS
ESC15-00188 Site Preparation4/2/20154/3/20154/3/2015 10:15:55 AMAPASS
Ryan Phone #: ###-####

Permit posted. Flat lot in 55+ community, sandbag in gutter to trap sediment migrating from site in gutter. MS4 over 100 M away. Perimeter wattles staked. RP/GC on site and very familiar with ESC and SWPP controls.

Approved.
ESC15-00187 Site Preparation4/2/20154/3/20154/3/2015 10:15:38 AMAPASS
Ryan Phone #: ###-####

Permit posted. Flat lot in 55+ community, sandbag in gutter to trap sediment migrating from site in gutter. MS4 over 100 M away. Perimeter wattles staked. RP/GC on site and very familiar with ESC and SWPP controls.

Approved.
ESC15-00185 Site Preparation4/2/20154/3/20154/3/2015 10:14:38 AMAPASS
Ryan Phone #: ###-####

Permit posted. Flat lot in 55+ community, sandbag in gutter to trap sediment migrating from site in gutter. MS4 over 100 M away. Perimeter wattles staked. RP/GC on site and very familiar with ESC and SWPP controls.

Approved.
ESC15-00186 Site Preparation4/2/20154/3/20154/3/2015 10:14:19 AMAPASS
Ryan Phone #: ###-####

Permit posted. Flat lot in 55+ community, sandbag in gutter to trap sediment migrating from site in gutter. MS4 over 100 M away. Perimeter wattles staked. RP/GC on site and very familiar with ESC and SWPP controls.

Approved.
ESC14-00998 Aging Inspection4/3/20154/3/20154/3/2015 9:02:40 AM PASS
ESC14-00943 General Inspection4/3/20154/3/20154/3/2015 8:39:23 AM PASS
Permit posted. Culdesac is free of significant amounts of loose dirt. Trash and materials are contained. The vegetated hillside below home has remained undisturbed. Approved.