ESC14-00996
| Aging Inspection | 4/3/2015 | 4/3/2015 | 4/3/2015 4:24:44 PM | | PASS |
|
|
Parking lot overlay complete. Site cleaned, temp BMPs removed. ESC permit finaled
|
ESC14-00996
| DOC - Permit Finaled | 4/3/2015 | 4/3/2015 | 4/3/2015 4:20:47 PM | P | PASS |
|
|
|
ESC14-00656
| General Inspection | 4/3/2015 | 4/3/2015 | 4/3/2015 3:10:44 PM | | PART |
|
|
WIP. Storm drains (private and MS4) have inlet protection. Parking lot already paved, no trackout or discharges.
Correction: Sweep up loose sediment in parking lot to prevent transport offsite.
|
ESC14-01006
| Aging Inspection | 4/3/2015 | 4/3/2015 | 4/3/2015 2:31:20 PM | | PASS |
|
|
Parking lot resurfacing complete. All temp BMPs removed and site was cleaned. ESC permit closed.
|
ESC14-01006
| DOC - Permit Finaled | 4/3/2015 | 4/3/2015 | 4/3/2015 2:29:26 PM | P | PASS |
|
|
|
ESC14-00662
| General Inspection | 4/3/2015 | 4/3/2015 | 4/3/2015 1:07:02 PM | | PASS |
|
|
DH#12 now has individual homes in progress. Washout and other BMPs installed. No sediment runoff or trackout issues. The stormwater ponde is still not complete nor stabilized. Subdivision development work inactive at this time.
|
ESC15-00320
| Random Inspection | 4/3/2015 | 4/3/2015 | 4/3/2015 12:15:00 PM | P | PASS |
|
|
Work is temporarily on hold. First section of biosolids has been moved and set out to dry. Work will continue again in a week or two per RP Shane. Permit is posted. No issues on site. Approved.
|
ESC15-00093
| DOC - Permit Finaled | 4/3/2015 | 4/3/2015 | 4/3/2015 12:08:24 PM | P | PASS |
|
|
Home construction complete and is occupied. Site has been cleaned and landscaped. No ESC corrective actions needed, active projects with permits ongoing in Mill District Square.
|
ESC14-00958
| Aging Inspection | 4/3/2015 | 4/3/2015 | 4/3/2015 12:06:10 PM | | PASS |
|
|
Home construction complete. West side of home is landscaped stabilzed. The east has active home in progress and will be landscaped upon completion. No sediment leaving site. No further ESC inspections needed.
|
ESC14-00958
| DOC - Permit Finaled | 4/3/2015 | 4/3/2015 | 4/3/2015 12:05:08 PM | P | PASS |
|
|
|
ESC14-00958
| DOC - Permit Finaled | 4/3/2015 | 4/3/2015 | 4/3/2015 12:03:55 PM | P | PASS |
|
|
|
ESC14-00753
| DOC - Permit Finaled | 4/3/2015 | 4/3/2015 | 4/3/2015 12:01:51 PM | P | PASS |
|
|
Construction complete, home occupied. Site has been cleaned and yard stabilized with bark mulch, bushes, and trees. DI bags to remain in inlets as work on nearby homes continues. ESC conditions met.
|
ESC15-00259
| Site Preparation | 4/2/2015 | 4/3/2015 | 4/3/2015 11:44:30 AM | A | NR |
|
|
Clint Phone #: ###-####
Subdivision BMPs installed properly- lot is ready for excavation.
Correction: need to post yellow ESC permit sign
|
ESC15-00232
| Site Preparation | 4/2/2015 | 4/3/2015 | 4/3/2015 11:41:36 AM | A | PASS |
|
|
Clint Phone #: ###-####
DH#12 BMPs installed (DI protection, lined concrete washout) and permits posted. Active projects are in compliance.
Note: called A Company to report the tipped over porta pot on Wolf Tree & Barnside. No spill of material and fortunately was a newly placed unit.
|
ESC15-00238
| Site Preparation | 4/3/2015 | 4/3/2015 | 4/3/2015 11:35:15 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Austin Wagner
Permit posted. Active Hunter projects are in good condition. Concrete trucks still utilizing the washout in Harris Crossing. As activity increases an onsite Hunter Homes washout will be requested
|
ESC14-00956
| General Inspection | 4/3/2015 | 4/3/2015 | 4/3/2015 10:35:12 AM | | PASS |
|
|
4-plex complete. Site has been landsca ped/stabilized and cleaned. ESC permit conditions stabilized.
Note - carport is complete, ESC fees paid but permits not issued...see BLD15-00521
|
ESC14-00956
| DOC - Permit Finaled | 4/3/2015 | 4/3/2015 | 4/3/2015 10:31:50 AM | P | PASS |
|
|
|
ESC15-00188
| Site Preparation | 4/2/2015 | 4/3/2015 | 4/3/2015 10:15:55 AM | A | PASS |
|
|
Ryan Phone #: ###-####
Permit posted. Flat lot in 55+ community, sandbag in gutter to trap sediment migrating from site in gutter. MS4 over 100 M away. Perimeter wattles staked. RP/GC on site and very familiar with ESC and SWPP controls.
Approved.
|
ESC15-00187
| Site Preparation | 4/2/2015 | 4/3/2015 | 4/3/2015 10:15:38 AM | A | PASS |
|
|
Ryan Phone #: ###-####
Permit posted. Flat lot in 55+ community, sandbag in gutter to trap sediment migrating from site in gutter. MS4 over 100 M away. Perimeter wattles staked. RP/GC on site and very familiar with ESC and SWPP controls.
Approved.
|
ESC15-00185
| Site Preparation | 4/2/2015 | 4/3/2015 | 4/3/2015 10:14:38 AM | A | PASS |
|
|
Ryan Phone #: ###-####
Permit posted. Flat lot in 55+ community, sandbag in gutter to trap sediment migrating from site in gutter. MS4 over 100 M away. Perimeter wattles staked. RP/GC on site and very familiar with ESC and SWPP controls.
Approved.
|
ESC15-00186
| Site Preparation | 4/2/2015 | 4/3/2015 | 4/3/2015 10:14:19 AM | A | PASS |
|
|
Ryan Phone #: ###-####
Permit posted. Flat lot in 55+ community, sandbag in gutter to trap sediment migrating from site in gutter. MS4 over 100 M away. Perimeter wattles staked. RP/GC on site and very familiar with ESC and SWPP controls.
Approved.
|
ESC14-00998
| Aging Inspection | 4/3/2015 | 4/3/2015 | 4/3/2015 9:02:40 AM | | PASS |
|
|
|
ESC14-00943
| General Inspection | 4/3/2015 | 4/3/2015 | 4/3/2015 8:39:23 AM | | PASS |
|
|
Permit posted. Culdesac is free of significant amounts of loose dirt. Trash and materials are contained. The vegetated hillside below home has remained undisturbed. Approved.
|