MEC18-01460
| Final | 4/3/2018 | 4/3/2018 | 4/3/2018 3:54:08 PM | P | PASS |
|
|
gas piping and test ok- co installed
|
MEC18-01460
| Pressure Test | 4/3/2018 | 4/3/2018 | 4/3/2018 3:53:37 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by chris mcdaniel- 20lb gas pass from furnace location to range location- co installed
|
MEC18-01475
| Final | 4/3/2018 | 4/3/2018 | 4/3/2018 3:14:22 PM | P | PASS |
|
|
Inspection requested via web by Margie Rowe- electric furnace heat pump ok
|
MEC18-01205
| Rough-in | 4/3/2018 | 4/3/2018 | 4/3/2018 2:47:19 PM | P | CANC |
|
|
MEC AND FIREPL Phone #: ###-#### Inspection requested via web by Oleg Chervak- scheduled wrong inspection
|
MEC18-01329
| Final | 3/27/2018 | 4/3/2018 | 4/3/2018 2:27:01 PM | P | PASS |
|
|
Please inspect after 1 PM Phone #: ###-#### Inspection requested via web by Mary LaFayette- electric furnace heat pump co ok
|
MEC18-01466
| Rough-in | 4/3/2018 | 4/3/2018 | 4/3/2018 2:00:43 PM | P | PASS |
|
|
MEC AND F.P R/I Oleg ###-####- R/I ok- fireplace R/I ok
|
MEC18-01462
| Final | 4/3/2018 | 4/3/2018 | 4/3/2018 1:19:11 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Mary LaFayette- furnace co ok
|
MEC18-01453
| Final | 3/31/2018 | 4/3/2018 | 4/3/2018 11:15:07 AM | A | PASS |
|
|
Home owner will be home Tuesday for the inspection. If there are any questions please call Larry at ###-####. Phone #: ###-#### Inspection requested via web by James Cox- furnace co ok
|
MEC18-01440
| Final | 3/29/2018 | 4/3/2018 | 4/3/2018 10:32:50 AM | A | PASS |
|
|
Inspection requested via web by Don Dowers- furnace ac coil co ok
|
MEC18-01440
| Pressure Test | 4/3/2018 | 4/3/2018 | 4/3/2018 10:31:22 AM | A | PASS |
|
|
Inspection requested via web by Don Dowers- 5lb flue pass
|
MEC18-01410
| Rough-in | 4/2/2018 | 4/3/2018 | 4/3/2018 9:58:17 AM | A | PASS |
|
|
cover inspection Phone #: ###-#### Inspection requested via web by Brandon Sorensen- insulation on duct ok- ok to cover- ok for ceiling tiles
|
MEC18-01457
| Final | 4/2/2018 | 4/3/2018 | 4/3/2018 9:48:26 AM | A | PART |
|
|
Please call Rick with questions, Thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum- rough in on make up and exhaust duct ok- installed per manufactures instasll- need to change duct sizing on exhaust from 12" to 10" thats installed- Rick will get with engineers- drawing by captive air for routing and clean outs
|
MEC18-00616
| Final | 4/2/2018 | 4/3/2018 | 4/2/2018 1:49:15 PM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by dannyel chaloupka Inspection cancelled from web by: dannyel chaloupka
|