Inspections for the day of: Tuesday, April 3, 2018.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBrian Scoles
TitleMEC INSPECTOR
Phone #914-4915
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC18-01460 Final4/3/20184/3/20184/3/2018 3:54:08 PMPPASS
gas piping and test ok- co installed
MEC18-01460 Pressure Test4/3/20184/3/20184/3/2018 3:53:37 PMPPASS
Phone #: ###-#### Inspection requested via web by chris mcdaniel- 20lb gas pass from furnace location to range location- co installed
MEC18-01475 Final4/3/20184/3/20184/3/2018 3:14:22 PMPPASS
Inspection requested via web by Margie Rowe- electric furnace heat pump ok
MEC18-01205 Rough-in4/3/20184/3/20184/3/2018 2:47:19 PMPCANC
MEC AND FIREPL Phone #: ###-#### Inspection requested via web by Oleg Chervak- scheduled wrong inspection
MEC18-01329 Final3/27/20184/3/20184/3/2018 2:27:01 PMPPASS
Please inspect after 1 PM Phone #: ###-#### Inspection requested via web by Mary LaFayette- electric furnace heat pump co ok
MEC18-01466 Rough-in4/3/20184/3/20184/3/2018 2:00:43 PMPPASS
MEC AND F.P R/I Oleg ###-####- R/I ok- fireplace R/I ok
MEC18-01462 Final4/3/20184/3/20184/3/2018 1:19:11 PMPPASS
Phone #: ###-#### Inspection requested via web by Mary LaFayette- furnace co ok
MEC18-01453 Final3/31/20184/3/20184/3/2018 11:15:07 AMAPASS
Home owner will be home Tuesday for the inspection. If there are any questions please call Larry at ###-####. Phone #: ###-#### Inspection requested via web by James Cox- furnace co ok
MEC18-01440 Final3/29/20184/3/20184/3/2018 10:32:50 AMAPASS
Inspection requested via web by Don Dowers- furnace ac coil co ok
MEC18-01440 Pressure Test4/3/20184/3/20184/3/2018 10:31:22 AMAPASS
Inspection requested via web by Don Dowers- 5lb flue pass
MEC18-01410 Rough-in4/2/20184/3/20184/3/2018 9:58:17 AMAPASS
cover inspection Phone #: ###-#### Inspection requested via web by Brandon Sorensen- insulation on duct ok- ok to cover- ok for ceiling tiles
MEC18-01457 Final4/2/20184/3/20184/3/2018 9:48:26 AMAPART
Please call Rick with questions, Thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum- rough in on make up and exhaust duct ok- installed per manufactures instasll- need to change duct sizing on exhaust from 12" to 10" thats installed- Rick will get with engineers- drawing by captive air for routing and clean outs
MEC18-00616 Final4/2/20184/3/20184/2/2018 1:49:15 PMACANC
Phone #: ###-#### >> Inspection requested via web by dannyel chaloupka Inspection cancelled from web by: dannyel chaloupka