ELE20-01203
| Final | 4/3/2020 | 4/3/2020 | 4/3/2020 2:13:05 PM | P | FAIL |
|
|
Final inspection for elevator / chair lift electrical only - elevator / chair lift installed by others Bruce is on site - call hi, when you arrive and he will give you instructions on location of chair lift Phone #: ###-#### Inspection requested via web by JENNY EMEL 620.5- Work clearances for lift disconnecting means shall comply with 110.26. Fused disconnect located 6' back inside beautiful metal door and frame work. A rail is located in the middle of disconnecting means. 620.51(C)- Lift disconnecting means shall be located where readily accessible. Around corner towards meter base ok due to very limited space.
|
ELE19-04799
| Electrical Rough-In | 4/3/2020 | 4/3/2020 | 4/3/2020 1:28:17 PM | P | PASS |
|
|
Elevated concrete deck rough in 4th floor deck over alley area Phone #: ###-#### Inspection requested via web by Jason Parke Area noted pour rough in ok cover
|
ELE19-00601
| Electrical Rough-In | 4/3/2020 | 4/3/2020 | 4/3/2020 12:44:57 PM | P | CANC |
|
|
2nd Floor Cover. Danny is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen Unable to perform inspection due to site is on a suspended job site list received 4-2-2020. General contractor to clear suspension which we will receive a confirmation notice and then have electrical contractor request inspections.
|
ELE19-01688
| Electrical Rough-In | 4/3/2020 | 4/3/2020 | 4/3/2020 12:41:42 PM | P | PASS |
|
|
Other electrodes such as underground water pipe and building steel will make up a grounding electrode system. Notes due to large amount of debris in area 3/0 bare copper conductor is positioned. Conrete encased electrode rough in ok cover.
|
ELE19-01688
| Rough-In Permanent Service | 4/2/2020 | 4/3/2020 | 4/3/2020 10:03:50 AM | A | CANC |
|
|
This is actually a Ufer ground inspection Phone #: ###-#### Inspection requested via web by Scott Campbell Called contact and informed this building permit is suspended job site list posted 4-2-2020. Asked to photo installation and recall when ready.
|
ELE20-00001
| Final | 4/2/2020 | 4/3/2020 | 4/3/2020 10:00:05 AM | A | PASS |
|
|
cleared // Steve Phone #: ###-#### As per 345 permit ok to final as payment is made in a large lump sum which takes time to post. Final ok
|
ELE20-00002
| Final | 4/2/2020 | 4/3/2020 | 4/3/2020 9:59:36 AM | A | PASS |
|
|
cleared // Steve Phone #: ###-#### As per 345 permit ok to final as payment is made in a large lump sum which takes time to post. Final ok
|
ELE20-00003
| Final | 4/2/2020 | 4/3/2020 | 4/3/2020 9:59:08 AM | A | PASS |
|
|
cleared // Steve Phone #: ###-#### As per 345 permit ok to final as payment is made in a large lump sum which takes time to post. Final ok
|
ELE20-00004
| Final | 4/2/2020 | 4/3/2020 | 4/3/2020 9:58:43 AM | A | PASS |
|
|
cleared // Steve Phone #: ###-#### As per 345 permit ok to final as payment is made in a large lump sum which takes time to post. Final ok
|
ELE20-00005
| Final | 4/2/2020 | 4/3/2020 | 4/3/2020 9:58:17 AM | A | PASS |
|
|
cleared // Steve Phone #: ###-#### As per 345 permit ok to final as payment is made in a large lump sum which takes time to post. Final ok
|
ELE20-00006
| Final | 4/2/2020 | 4/3/2020 | 4/3/2020 9:57:47 AM | A | PASS |
|
|
cleared // Steve Phone #: ###-#### As per 345 permit ok to final as payment is made in a large lump sum which takes time to post. Final ok
|
ELE20-00007
| Final | 4/2/2020 | 4/3/2020 | 4/3/2020 9:57:21 AM | A | PASS |
|
|
cleared // Steve Phone #: ###-#### As per 345 permit ok to final as payment is made in a large lump sum which takes time to post. Final ok
|
ELE20-00008
| Final | 4/2/2020 | 4/3/2020 | 4/3/2020 9:56:51 AM | A | PASS |
|
|
cleared // Steve Phone #: ###-#### As per 345 permit ok to final as payment is made in a large lump sum which takes time to post. Final ok
|
ELE20-00956
| Rough-In Permanent Service | 4/2/2020 | 4/3/2020 | 4/3/2020 9:54:29 AM | A | PASS |
|
|
Contact is Derek Ball Phone #: ###-#### Inspection requested via web by Scott Campbell Pedistal to East of Loess Pl. p/s u/g n ok
|
ELE19-01688
| Electrical Rough-In | 4/2/2020 | 4/3/2020 | 4/3/2020 9:53:01 AM | A | CANC |
|
|
Rough-In Walls for G level Phone #: ###-#### Inspection requested via web by Scott Campbell Called contact and informed this building permit is on the suspended job lite list posted 4-2-2020. Asked them to take several photos and recall for Monday when the normal inspector is scheduled to be back at work.
|
ELE20-01145
| Conference | 4/2/2020 | 4/3/2020 | 4/3/2020 9:06:16 AM | P | CANC |
|
|
NEED CONSULTATION PLEASE. House had a fire. Need consultation to get it up to code. Thank you, Have a bless weekend, Phone #: ###-#### >> Inspection requested via web by Kyle Lott Inspection cancelled from web by: Kyle Lott
|