BLD19-03112
| BLD-Footing | 4/3/2020 | 4/3/2020 | 4/3/2020 4:49:39 PM | P | PART |
|
|
cleared - crawlspace and garage // Chris Phone #: ###-####,, work in progress,, ok
|
BLD20-00621
| BLD-Final | 4/2/2020 | 4/3/2020 | 4/3/2020 4:42:22 PM | P | PASS |
|
|
*cleared* Lynn Phone #: ###-####
|
BLD20-00621
| DOC - Permit Finaled | 4/3/2020 | 4/3/2020 | 4/3/2020 4:42:08 PM | P | PASS |
|
|
c of c-o issued
|
BLD19-01675
| BLD-Conference | 4/2/2020 | 4/3/2020 | 4/3/2020 4:15:05 PM | A | DEFR |
|
|
Phone #: 6786443014 >> Inspection requested via mobile web by Cody Sandercock // called to defr for Monday
|
BLD20-00172
| BLD-Framing/Rough-in | 4/2/2020 | 4/3/2020 | 4/3/2020 4:11:17 PM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by Ryan Kohler.. needs fire pass// need to verify prior frame c/n
|
BLD20-00161
| BLD-Framing/Rough-in | 4/2/2020 | 4/3/2020 | 4/3/2020 4:09:45 PM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by Ryan Kohler.. needs fire pass
|
BLD20-00173
| BLD-Energy code compliance | 4/2/2020 | 4/3/2020 | 4/3/2020 4:09:00 PM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by Ryan Kohler// needs fire pass
|
BLD20-00158
| BLD-Energy code compliance | 4/2/2020 | 4/3/2020 | 4/3/2020 4:08:39 PM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by Ryan Kohler
|
BLD19-01933
| BLD-Conference | 4/2/2020 | 4/3/2020 | 4/3/2020 4:02:12 PM | A | PART |
|
|
David- **Cleared** Phone #: ###-####,, needs electrical 1st,, then..,, frame ok to insulate,, need to verify seal pack and furr downs for ducting,, fire blocking
|
BLD19-01962
| BLD-Framing/Rough-in | 4/2/2020 | 4/3/2020 | 4/3/2020 3:58:12 PM | A | PART |
|
|
David- **Cleared** Phone #: ###-####,, frame ok to insulate,, need to verify seal pack and furr downs for ducting,, fire blocking
|
BLD20-00245
| BLD-Wall Bracing | 4/3/2020 | 4/3/2020 | 4/3/2020 1:47:17 PM | P | PASS |
|
|
Exterior Shear wall inspection for cover. East wall of building. Phone #: ###-#### Inspection requested via web by Jon King
|
BLD19-04878
| BLD-Conference | 4/2/2020 | 4/3/2020 | 4/3/2020 1:27:39 PM | A | PASS |
|
|
window well ok for intent of code,, better than existing
|
BLD19-04101
| BLD-Conference | 4/2/2020 | 4/3/2020 | 4/3/2020 1:26:42 PM | A | NR |
|
|
passed screening - driveway inspect // Shawn Phone #: ###-####,, needs historical, hand rails,, address visible from 6th and alley,, fire caulking
|
BLD19-04535
| BLD-Energy code compliance | 4/2/2020 | 4/3/2020 | 4/3/2020 12:19:27 PM | A | NR |
|
|
Derek- ''has been screened**404app** Phone #: ###-####
|
BLD19-03895
| BLD-Framing/Rough-in | 4/2/2020 | 4/3/2020 | 4/3/2020 11:53:49 AM | A | FAIL |
|
|
Craig Phone #: ###-####,, c/n posted,, straps, point loads,, overbuild bearing, double king studs, etc,, ok to insulate if needed
|
MIS19-00148
| DOC - Permit Finaled | 4/3/2020 | 4/3/2020 | 4/3/2020 10:49:52 AM | P | PASS |
|
|
|
BLD19-04932
| BLD-Conference | 4/2/2020 | 4/3/2020 | 4/3/2020 10:47:34 AM | A | PART |
|
|
Danny Phone #: ###-####/// new contractor taking over job,, ?s on beam.. needs to have engineer of record look at it
|
BLD20-00457
| BLD-Footing | 4/1/2020 | 4/3/2020 | 4/3/2020 10:35:30 AM | A | PART |
|
|
Bart Phone #: ###-####,, east and west outside footings ok on outside of existing home
|