BLD19-01648
| BLD-Aging Inspection | 4/3/2020 | 4/3/2020 | 4/7/2020 7:15:58 AM | | PEND |
|
|
|
BLD19-03949
| BLD-Final | 4/3/2020 | 4/3/2020 | 4/3/2020 4:26:47 PM | P | PASS |
|
|
screened // Christina Phone #: ###-####
|
BLD19-03949
| DOC - Permit Finaled | 4/3/2020 | 4/3/2020 | 4/3/2020 4:26:38 PM | P | PASS |
|
|
|
BLD19-03507
| BLD-Wall Bracing | 4/3/2020 | 4/3/2020 | 4/3/2020 4:12:14 PM | P | PART |
|
|
screened // Eber Phone #: ###-####//need to add hot dip galvanized nails at pt plates//nailing ok otherwise//soffit detail shows two layers gyp on west of garage, need to add 1 layer//
|
BLD20-00059
| BLD-Foundation | 4/3/2020 | 4/3/2020 | 4/3/2020 3:51:44 PM | P | PASS |
|
|
cleared // Edgar Phone #: ###-####
|
BLD19-03949
| BLD-Blower Door Test Results | 4/3/2020 | 4/3/2020 | 4/3/2020 3:01:23 PM | P | DONE |
|
|
3.32 ACH 50
|
BLD19-04970
| BLD-Final | 4/3/2020 | 4/3/2020 | 4/3/2020 2:42:17 PM | P | PASS |
|
|
virtual inspection only // Scott Phone #: ###-####//appears to be complete, video conference was used for final inspection du to pandemic/
|
BLD19-04970
| DOC - Permit Finaled | 4/3/2020 | 4/3/2020 | 4/3/2020 2:41:37 PM | P | PASS |
|
|
final completed via videoconference due to pandemic//
|
BLD19-00532
| BLD-Wall Bracing | 4/2/2020 | 4/3/2020 | 4/3/2020 2:10:48 PM | P | PART |
|
|
Shear panels only on exterior of bldg. Hardware next week Phone #: ###-#### Inspection requested via web by Travis Blackburn//need to add hot dip galvanized nails at coridors, and areas marked//will check hardware in next inspection//
|
BLD19-04013
| BLD-Wall Bracing | 4/3/2020 | 4/3/2020 | 4/3/2020 1:07:37 PM | P | PART |
|
|
*cleared* Please call ahead so site can cleared Pat Phone #: ###-####///second story interior shear walls prior to gyp cover//
|
BLD20-00478
| BLD-Final | 4/2/2020 | 4/3/2020 | 4/3/2020 12:34:22 PM | A | PART |
|
|
derek Phone #: ###-####//onsite ok looking from exterior//need to add interconnected smoke and smoke/co detectors//Derek will video call when installed//
|
BLD19-04304
| BLD-Foundation | 4/3/2020 | 4/3/2020 | 4/3/2020 11:00:15 AM | A | PART |
|
|
Pour scheduled for 12 o’clock Phone #: ###-#### Inspection requested via web by Edgar Sanchez//WIP//discussed pouring frost wall at garage per details on foundation plans//was not set at time of inspection//
|
BLD20-00059
| BLD-Foundation | 4/3/2020 | 4/3/2020 | 4/3/2020 10:59:24 AM | A | NR |
|
|
Pour scheduled for 12 o’clock Phone #: ###-#### Inspection requested via web by Edgar Sanchez
|
MIS20-00100
| BLD-Conference | 4/2/2020 | 4/3/2020 | 4/3/2020 10:47:51 AM | A | DONE |
|
|
due to no inpections on occupied residential during the pandemic, a visual from street of the shed, appears to be in the 200 sq ft or under allowed by code with no permit, no cantact with owner was made//
|
BLD20-00651
| BLD-Final | 3/9/2020 | 4/3/2020 | 4/3/2020 9:52:59 AM | A | PASS |
|
|
jon ###-####//signed card, advised Jon that any changes to the floor plan, ie new offices, layout etc, would require a permit, he stated they would be getting a permit for remodel//
|
BLD20-00159
| BLD-Final | 4/2/2020 | 4/3/2020 | 4/3/2020 9:10:17 AM | A | PASS |
|
|
Tom **stated no one is sick or has traveled. That the house is not lived in** Phone #: ###-####//complete per description, minor interior improvements//
|
BLD20-00159
| DOC - Permit Finaled | 4/3/2020 | 4/3/2020 | 4/3/2020 9:09:43 AM | P | PASS |
|
|
|
BLD20-00467
| BLD-Final | 4/2/2020 | 4/3/2020 | 4/3/2020 8:49:56 AM | A | NR |
|
|
Please call Darren one hour in advance if you would like him to be there for inspection. Thanks! Phone #: ###-#### Inspection requested via web by Sarah Schuller//need to have fire setback on east side approved, panels extend to the edge of the eave, plans show a 36" setback from eave for access//
|