MEC96-01115
| INSP - Framing/ Rough-in | 4/29/1996 | 4/30/1996 | 4/30/1996 12:00:00 AM | A | PASS |
|
|
SUITE 1001
|
MEC96-01167
| INSP - Framing/ Rough-in | 4/29/1996 | 4/30/1996 | 4/30/1996 12:00:00 AM | A | PART |
|
|
ok to cover but have corrections to check on final, lower combustion air into existing mech. room
|
MEC96-01206
| INSP - Miscellaneous | 4/29/1996 | 4/30/1996 | 4/30/1996 12:00:00 AM | P | PASS |
|
|
TUES PM...HYDRONIC PIPING..SUITE 806
|
MEC96-01206
| INSP - Gas pressure test | 4/29/1996 | 4/30/1996 | 4/30/1996 12:00:00 AM | P | PASS |
|
|
TUES PM..SUITE 806
|
MEC96-01259
| INSP - Retro Fit (check note) | 4/30/1996 | 4/30/1996 | 4/30/1996 12:00:00 AM | P | PASS |
|
|
furnace and no gas test required ok
|
MEC96-01005
| INSP - Final | 4/30/1996 | 4/30/1996 | 4/30/1996 12:00:00 AM | P | PASS |
|
|
THIS IS FOR THE 4TH FLOOR
|
MEC96-01005
| INSP - Final | 4/30/1996 | 4/30/1996 | 4/30/1996 12:00:00 AM | P | PASS |
|
|
THIS IS FOR THE 4TH FLOOR
|