ELE01-01173
| Final | 4/27/2001 | 4/30/2001 | 4/30/2001 12:00:00 AM | A | FAIL |
|
|
fn insp-- ron ###-####-- call 1st before insp needs switch phase and neutral wires, and remove cabinets from above panel 4/30/2001 9:49:13 AM
|
ELE01-01138
| Final | 4/27/2001 | 4/30/2001 | 4/30/2001 12:00:00 AM | A | NR |
|
|
fn --greg-- ###-#### --call1 1st before insp contractor said he needs P M inspection in stead of A M inspection 4/30/2001 12:35:14 PM
|
ELE01-00268
| Final | 4/27/2001 | 4/30/2001 | 4/30/2001 12:00:00 AM | A | FAIL |
|
|
greg ###-#### fn - conference only ok 4/30/2001 11:05:06 AM
|
ELE01-01382
| Temporary Service | 4/30/2001 | 4/30/2001 | 4/30/2001 12:00:00 AM | P | PASS |
|
|
t/s o/h new ok 4/30/2001 1:01:59 PM
|
ELE01-00423
| Rough-In Permanent Service | 4/30/2001 | 4/30/2001 | 4/30/2001 12:00:00 AM | P | FAIL |
|
|
ALLEN ###-#### cor. posted called 300-4 for high and low voltage cables 210-52(a) kitchen
wall space under window area, 250-24 terminate GEC at neutral bus, 250-66 size bond to water system with proper size conductor 4/30/2001 3:24:12 PM
|
ELE01-00422
| Rough-In Permanent Service | 4/30/2001 | 4/30/2001 | 4/30/2001 12:00:00 AM | P | FAIL |
|
|
ALLEN###-#### see PM# ele01-00423 for details 4/30/2001 3:34:11 PM
|
ELE01-01220
| Final | 4/30/2001 | 4/30/2001 | 4/30/2001 12:00:00 AM | P | FAIL |
|
|
###-#### still needs to remove a/c lines from below p/s bond hot a7cold with #4 seal ko s guy mast so it opposes the strain of service drop 4/30/2001 2:11:53 PM
|
ELE01-01138
| Electrical Rough-In | 4/30/2001 | 4/30/2001 | 4/30/2001 12:00:00 AM | P | NR |
|
|
Scheduled by Inspector: 315 On 4/30/2001 12:33:24 PM contractor called , not ready 4/30/2001 4:35:05 PM
|