BLD01-00252
| BLD-Conference | 4/30/2001 | 4/30/2001 | 4/30/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 4/30/2001 11:56:29 AM w/ bldr re glazing, handrail issues.
|
BLD96-01757
| BLD-Conference | 4/27/2001 | 4/30/2001 | 4/30/2001 12:00:00 AM | A | PASS |
|
|
Dave Bruce ###-####; w/ owner Welsh Photo & contractor's rep...need card w/ signatures, will consult 325 re other issues & time frame for "old" permit. Elec & plbg are signed off. 4/30/2001 11:55:30 AM
|
BLD01-00452
| BLD-Framing/Rough-in | 4/27/2001 | 4/30/2001 | 4/30/2001 12:00:00 AM | A | PART |
|
|
###-#### call 15min before you go, c/n: nee deng'g for holes in beam for plbg, verify hood operation, submit for main doors. Ok to cover other walls 4/30/2001 1:23:16 PM
|
BLD00-02971
| BLD-Conference | 4/27/2001 | 4/30/2001 | 4/30/2001 12:00:00 AM | A | PASS |
|
|
Pita Pit, w/ owner, need card for t/o. 4/30/2001 3:39:09 PM
|
BLD01-00339
| BLD-Footing | 4/30/2001 | 4/30/2001 | 4/30/2001 12:00:00 AM | P | NR |
|
|
ft insp michael ###-####...sent to 420 4/30/2001 2:15:07 PM
|
BLD01-00719
| BLD-Framing/Rough-in | 4/30/2001 | 4/30/2001 | 4/30/2001 12:00:00 AM | P | NR |
|
|
shear wall michael ###-####
|
BLD00-03173
| BLD-Final | 4/30/2001 | 4/30/2001 | 4/30/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/30/2001 at 10:41:12. Contact: ###-####.
|
BLD00-03174
| BLD-Final | 4/30/2001 | 4/30/2001 | 4/30/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/30/2001 at 10:42:26. Contact: ###-####.
|
BLD01-00338
| BLD-Energy code compliance | 4/30/2001 | 4/30/2001 | 4/30/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 04/30/2001 at 11:20:25. Contact: ###-####...has TJI eng'g onsite, ok to cover per 420 4/30/2001 3:48:43 PM
|
BLD01-00338
| BLD-Conference | 4/30/2001 | 4/30/2001 | 4/30/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/30/2001 at 11:20:54. Contact: ###-####.
|
BLD00-02394
| BLD-Concrete | 4/30/2001 | 4/30/2001 | 4/30/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 4/30/2001 12:05:22 PM has MTI onsite for parapet wall/slab tie & upgrade...
|
BLD00-02971
| BLD-Final | 4/30/2001 | 4/30/2001 | 4/30/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 4/30/2001 3:40:07 PM keep c/n, ok for t/o...need elec, fire oks
|
BLD00-02062
| BLD-Conference | 4/30/2001 | 4/30/2001 | 4/30/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 4/30/2001 4:04:20 PM w/ Cornell Larson...may need add'l plan/ submittal for changes...Meet onsite??
|
BLD00-03538
| BLD-Concrete | 4/30/2001 | 4/30/2001 | 4/30/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 4/30/2001 4:21:00 PM Wip; PEND REPORTS; walls to deck...2hr req'd...looks ok
|
BLD99-03383
| BLD-Framing/Rough-in | 4/30/2001 | 4/30/2001 | 4/30/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 4/30/2001 5:00:36 PM firestops at 3rd fl curtain wall/floor...ok; has mti insp. too.
|