BLD99-00444
| BLD-Framing/Rough-in | 4/24/2001 | 4/30/2001 | 4/30/2001 12:00:00 AM | A | PART |
|
|
reinspection pat ###-#### still has c/n will recall. 11/30/2001 4:21:19 PM
|
BLD01-00760
| BLD-Energy code compliance | 4/27/2001 | 4/30/2001 | 4/30/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD01-00760
| BLD-Framing/Rough-in | 4/27/2001 | 4/30/2001 | 4/30/2001 12:00:00 AM | A | FAIL |
|
|
complete prior c/n. 11/30/2001 10:30:29 AM
|
BLD01-00805
| BLD-Framing/Rough-in | 4/30/2001 | 4/30/2001 | 4/30/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/30/2001 at 08:10:36. Contact: ###-####. may req 1 addnl post at east side as shown on plans,owner will have beam calc. 11/30/2001 3:22:31 PM
|
BLD01-00824
| BLD-Footing | 4/30/2001 | 4/30/2001 | 4/30/2001 12:00:00 AM | P | PART |
|
|
ft insp jim-- ###-#### ok no steel in place. 11/30/2001 3:34:44 PM
|
BLD00-03220
| BLD-Final | 4/30/2001 | 4/30/2001 | 4/30/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/30/2001 at 09:52:07. Contact: ###-####.c/n posted. 11/30/2001 4:21:39 PM
|
BLD00-02842
| BLD-Final | 4/30/2001 | 4/30/2001 | 4/30/2001 12:00:00 AM | P | FAIL |
|
|
###-####
|