BLD00-02268
| BLD-Conference | 4/27/2001 | 4/30/2001 | 4/30/2001 12:00:00 AM | A | PASS |
|
|
###-#### 4x12 stringers for stairs per plan 4/30/2001 11:31:39 AM
|
BLD00-02302
| BLD-Footing | 4/27/2001 | 4/30/2001 | 4/30/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD00-01744
| BLD-Conference | 4/30/2001 | 4/30/2001 | 4/30/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 408 On 4/30/2001 2:23:07 PM
|
BLD00-01744
| BLD-Conference | 4/30/2001 | 4/30/2001 | 4/30/2001 12:00:00 AM | P | CANC |
|
|
Added by Inspector: 408 On 4/30/2001 3:58:52 PM
|
BLD00-03041
| BLD-Framing/Rough-in | 4/30/2001 | 4/30/2001 | 4/30/2001 12:00:00 AM | P | NR |
|
|
fr insp paul- ###-#### --call 1st before insp please
|
BLD01-00780
| BLD-Framing/Rough-in | 4/30/2001 | 4/30/2001 | 4/30/2001 12:00:00 AM | P | PART |
|
|
shear wall-- walt- ###-#### ok to side 4/30/2001 2:03:23 PM
|
BLD01-00686
| BLD-Framing/Rough-in | 4/30/2001 | 4/30/2001 | 4/30/2001 12:00:00 AM | P | NR |
|
|
shear wall-- ###-#### no plans on site 4/30/2001 2:03:00 PM
|
BLD99-00253
| BLD-Final | 4/30/2001 | 4/30/2001 | 4/30/2001 12:00:00 AM | P | NR |
|
|
###-#### open at 10am
|
BLD00-01760
| BLD-Conference | 4/27/2001 | 4/30/2001 | 4/27/2001 12:00:00 AM | A | PART |
|
|
for conf---with the permit holder-slow progress
|