PLM02-01173
| Sprinkler (Final) | 4/29/2002 | 4/30/2002 | 4/30/2002 12:00:00 AM | A | PASS |
|
|
paul -###-#### backflow
|
PLM02-00768
| Plumbing Rough-in | 4/30/2002 | 4/30/2002 | 4/30/2002 12:00:00 AM | P | NR |
|
|
###-#### GREG
|
PLM02-01186
| Plumbing Rough-in | 4/30/2002 | 4/30/2002 | 4/30/2002 12:00:00 AM | P | NR |
|
|
r/i ###-####- greg
|
PLM02-01188
| Water and/or Sewer | 4/30/2002 | 4/30/2002 | 4/30/2002 12:00:00 AM | P | NR |
|
|
jan ###-#### water line
|
PLM02-01188
| Sprinkler (Final) | 4/30/2002 | 4/30/2002 | 4/30/2002 12:00:00 AM | P | NR |
|
|
jan--###-#### backflow
|
PLM02-01186
| Groundwork | 4/30/2002 | 4/30/2002 | 4/30/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 334 On 4/30/2002 1:38:16 PM
|