MEC01-03243
| Final | 4/29/2002 | 4/30/2002 | 4/30/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
MEC02-01168
| Final | 4/29/2002 | 4/30/2002 | 4/30/2002 12:00:00 AM | A | FAIL |
|
|
a-1 fireplace--###-#### for f/p no address posted 4/30/2002 9:27:04 AM
|
MEC02-01137
| Rough-in | 4/29/2002 | 4/30/2002 | 4/30/2002 12:00:00 AM | A | PART |
|
|
###-####- john for homeowner r/i u/g gas pipe to garage and test ok 4/30/2002 1:09:50 PM
|
MEC02-00803
| Final | 4/29/2002 | 4/30/2002 | 4/30/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/29/2002 at 13:06:14. Contact: ###-####.
|
MEC01-03350
| Final | 4/29/2002 | 4/30/2002 | 4/30/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/29/2002 at 16:59:53. Contact: ###-####. no address posted 4/30/2002 9:26:55 AM
|
MEC02-01066
| Final | 4/30/2002 | 4/30/2002 | 4/30/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 407 On 4/30/2002 12:17:41 PM
|
MEC02-01119
| Final | 4/30/2002 | 4/30/2002 | 4/30/2002 12:00:00 AM | P | PASS |
|
|
|
MEC02-00304
| Final | 4/30/2002 | 4/30/2002 | 4/30/2002 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 04/30/2002 at 07:55:54. Contact: ###-####.
|
MEC02-00745
| Final | 4/30/2002 | 4/30/2002 | 4/30/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/30/2002 at 07:56:58. Contact: ###-####. no card on site..no super on site...called ben 4/30/2002 4:04:10 PM
|
MEC02-01178
| Pressure Test | 4/30/2002 | 4/30/2002 | 4/30/2002 12:00:00 AM | P | NH |
|
|
###-#### brad a/c-heating package unit..off cole before I-84 4/30/2002 1:24:11 PM called # and left message 4/30/2002 2:12:53 PM
|
MEC02-00921
| Rough-in | 4/29/2002 | 4/30/2002 | 4/30/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/29/2002 at 16:26:37. Contact: ###-####.
|
MEC02-00921
| Pressure Test | 4/29/2002 | 4/30/2002 | 4/30/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/29/2002 at 16:26:52. Contact: ###-####.
|