ELE08-01073
| Electrical Rough-In | 4/30/2008 | 4/30/2008 | 4/30/2008 5:11:02 PM | P | CANC |
|
|
. .1. this inspection has already been done. . . . .1. It does need to have the address changed on it however, it is on the wrong side of the street. . .
|
ELE08-01084
| Conference | 4/29/2008 | 4/30/2008 | 4/30/2008 4:49:35 PM | P | DONE |
|
|
xavier Please call 1 hr before going out Phone #: ###-#### . .1. talked about the service and that he realy needed to consider hiring a contractor. The reason for this was that I was not really comfortable with his ability to change the service out by himself. I explained to him that if he made a mistake and there were corrections that needed to be made, he would be without power until the corrections were done. I informed him that there was no temp power while he made the corrections. . .
|
ELE08-01073
| Electrical Rough-In | 4/30/2008 | 4/30/2008 | 4/30/2008 3:06:39 PM | P | PASS |
|
|
mike Phone #: ###-#### . .1. ok to cover cement with dirt. . .
|
ELE08-00862
| Final | 4/29/2008 | 4/30/2008 | 4/30/2008 12:48:39 PM | P | CANC |
|
|
Phone #: ###-#### Internet Inspection Request from: Lloyd Looney . .1. wrong inspection. . .
|
ELE08-01087
| Electrical Rough-In | 4/30/2008 | 4/30/2008 | 4/30/2008 12:36:46 PM | P | PASS |
|
|
hz Phone #: ###-#### . .1. ri ok. . .
|
ELE08-01045
| Final | 4/30/2008 | 4/30/2008 | 4/30/2008 12:01:26 PM | P | PASS |
|
|
john - please call 1/2 hr prior so he can meet you there Phone #: ###-#### . .1. final ok. . .
|
ELE08-00658
| Permanent Service | 4/29/2008 | 4/30/2008 | 4/30/2008 11:32:30 AM | A | FAIL |
|
|
service grounding inspection Phone #: ###-#### Internet Inspection Request from: HARVEY REYNA . .1. no access to the panel. . .
|
ELE08-00923
| Final | 4/29/2008 | 4/30/2008 | 4/30/2008 10:13:16 AM | A | PASS |
|
|
Please call Greg with CM Company for access into building. He can show you where we relocated modular floor boxes and added 2 new. If Greg can not be reached, please call JOE at ###-####. Thanks! Phone #: ###-#### Internet Inspection Request from: Loren Ramsey . .1. final ok. . .
|
ELE08-00923
| Electrical Rough-In | 4/30/2008 | 4/30/2008 | 4/30/2008 9:51:00 AM | P | PASS |
|
|
Please call Greg with CM Company for access into building. He can show you where we relocated modular floor boxes and added 2 new. If Greg can not be reached, please call JOE at ###-####. Thanks! Phone #: ###-#### Internet Inspection Request from: Loren Ramsey . .1. ri ok. . .
|
ELE07-03524
| Final | 4/28/2008 | 4/30/2008 | 4/30/2008 9:28:26 AM | A | PASS |
|
|
kyle Phone #: ###-####
|
ELE07-03280
| Final | 4/29/2008 | 4/30/2008 | 4/30/2008 9:07:36 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 4/29/2008 at 7:24:08 AM. Contact: ###-####. . .1. final ok as noted on prints for this phase. . .
|