ESC09-00164
| Site Preparation | 4/30/2009 | 4/30/2009 | 4/30/2009 3:07:14 PM | P | FAIL |
|
|
Observed minor volume of turbid water being discharged into the Boise River. Contractor shut off dewatering activities. Instructed RP that no turbid discharges can occur into the river or MS4 system. Also discussed with Parks, (Maria). Inspector 460 will follow up on 5/1/09.
|