FIR09-00017
| FIR-Aging Inspection | 4/30/2009 | 4/30/2009 | 5/8/2009 12:06:11 PM | | NR |
|
|
work in progress
|
FIR09-00154
| INSP-Final Inspection | 4/29/2009 | 4/30/2009 | 4/30/2009 3:34:15 PM | A | PASS |
|
|
Permit finaled.
|
FIR09-00179
| INSP-Sprinkler Rough-in | 4/29/2009 | 4/30/2009 | 4/30/2009 3:33:33 PM | A | PASS |
|
|
The piping above the mezzanine can be covered. The insulation is not completely installed and will require another inspection. I found where the AP upright sprinkler heads are not within their listed distance from the deck, 1"-3", as per the data sheet. Also the AP heads need to be within 5'-0" of the exterior walls as per the detail provided on the city approved plans. The insulation is blocking the spray of the upright heads beneath the mezzanine as well.
|
FIR04-00349
| INSP-Conference | 4/30/2009 | 4/30/2009 | | P | |
|
|
Jeff; Phone ###-####
|