Inspections for the day of: Thursday, April 30, 2009.
Number of inspections: 4
Percentage of inspections complete: 75 %
Percentage of inspections not complete: 25 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR09-00017 FIR-Aging Inspection4/30/20094/30/20095/8/2009 12:06:11 PM NR
work in progress
FIR09-00154 INSP-Final Inspection4/29/20094/30/20094/30/2009 3:34:15 PMAPASS
Permit finaled.
FIR09-00179 INSP-Sprinkler Rough-in4/29/20094/30/20094/30/2009 3:33:33 PMAPASS
The piping above the mezzanine can be covered. The insulation is not completely installed and will require another inspection. I found where the AP upright sprinkler heads are not within their listed distance from the deck, 1"-3", as per the data sheet. Also the AP heads need to be within 5'-0" of the exterior walls as per the detail provided on the city approved plans. The insulation is blocking the spray of the upright heads beneath the mezzanine as well.
FIR04-00349 INSP-Conference4/30/20094/30/2009 P 
Jeff; Phone ###-####