ESC10-00008
| Site Preparation | 4/20/2010 | 4/30/2010 | 4/30/2010 2:41:51 PM | P | NR |
|
|
Work has not started. Will re-inspect in one week.
|
ESC10-00226
| General Inspection | 4/30/2010 | 4/30/2010 | 4/30/2010 2:05:57 PM | P | PASS |
|
|
Washout is built out of concrete block, needs a liner prior to using. Controls are in place.
|
ESC10-00293
| Site Preparation | 4/30/2010 | 4/30/2010 | 4/30/2010 7:38:52 AM | | CANC |
|
|
Inspection pased by inspector 316 on 4/27/10
|