FIR14-00197
| INSP-Conference | 4/30/2014 | 4/30/2014 | 5/1/2014 3:37:16 PM | P | DONE |
|
|
Discussed placement of the new riser so as not to obstruct the existing fire alarm equipment.
|
BLD13-02587
| FIRE-Final Inspection | 4/30/2014 | 4/30/2014 | 4/30/2014 4:09:46 PM | P | FAIL |
|
|
Provide the third E-stop, permianant mount the E-stop sign, provide additional warning signs at pumps, test the duct smoke detectors, blank the thumbturn lock at the main exit as discussed
|
FIR13-00723
| INSP-Sprinkler Rough-in | 4/30/2014 | 4/30/2014 | 4/30/2014 3:07:32 PM | P | PASS |
|
|
Inspection for the hangers at teh deck passed and can be covered.
|
BLD14-00064
| FIRE-Final Inspection | 4/29/2014 | 4/30/2014 | 4/30/2014 10:05:52 AM | A | PASS |
|
|
life safety passed
|
FIR13-00522
| INSP-Final Inspection | 4/28/2014 | 4/30/2014 | 4/30/2014 8:47:45 AM | P | PASS |
|
|
permit finaled
|
FIR13-00709
| INSP-Final Inspection | 4/29/2014 | 4/30/2014 | 4/29/2014 2:17:33 PM | A | PASS |
|
|
permit finaled
|
FIR13-00565
| INSP-Final Inspection | 4/29/2014 | 4/30/2014 | 4/29/2014 2:17:12 PM | A | PASS |
|
|
Permit finaled
|