Inspections for the day of: Thursday, April 30, 2015.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorKatie Marron
TitleFIRE INSPECTOR
Phone #395-7809
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR15-00262 INSP-Sprinkler Rough-in4/30/20154/30/20154/30/2015 3:39:23 PMPFAIL
Soffit with two new pendants was fully enclosed, and pipe drops was not able to be seen. Contractor to expose pipes and reschedule.
FIR14-00281 INSP-Final Inspection4/29/20154/30/20154/30/2015 2:56:02 PMAPART
Functional test of alarm system complete. Verified previous correction notice items completed satisfactory. Final pending initiating device map posted at FACP and dedicated alarm panel circuit breaker locked out.
FIR14-00912 INSP-Sprinkler Rough-in/Hydro4/30/20154/30/20154/30/2015 2:51:31 PMPCANC
Cancelled due to inspection load
FIR15-00200 INSP-Final Inspection4/29/20154/30/20154/30/2015 1:59:55 PMAPASS
Scope of work complete. Permit Finaled
BLD15-00193 FIRE-Final Inspection4/29/20154/30/20154/30/2015 10:09:12 AMAPASS
Fire life safety pass.
FIR15-00245 INSP-Final Inspection4/29/20154/30/20154/30/2015 10:08:40 AMAPASS
Scope of work complete. Strobes moved to appropriate height per code and adjusted for adequate coverage. Permit finaled.
FIR15-00125 INSP-Final Inspection4/29/20154/30/20154/29/2015 3:42:16 PMAPASS
Inspection completed on 4/29/15. Scope of work complete. Verified all heads are now standard response 200 degree. Permit finaled.