ESC15-00413
| Site Preparation | 4/30/2015 | 4/30/2015 | 4/30/2015 4:10:03 PM | P | PASS |
|
|
Clint Phone #: ###-####
Approved. EV projects by Tahoe in good standing. BMPs installed, no violations.
|
ESC14-01023
| Random Inspection | 4/30/2015 | 4/30/2015 | 4/30/2015 2:51:36 PM | P | PASS |
|
|
Rock retaining wall behind home is now installed. Site has been swept and cleaned since prior inspeciton/correction request.
Hydroseeding not yet performed. No hillside erosion or other issues currently. NO corrections.
|
ESC14-00614
| General Inspection | 4/29/2015 | 4/30/2015 | 4/30/2015 2:49:14 PM | A | PASS |
|
|
Home construction complete and adnacent lot has been cleaned with all materials removed. (builder owns lot). Silt fence to remain installed until grass under erosion control blanket is fully established. Street and sidwalk are swept, site is landscaped. Approved.
|
ESC14-00848
| General Inspection | 4/29/2015 | 4/30/2015 | 4/30/2015 2:36:59 PM | A | PASS |
|
|
Pool is complete. Materials have been removed and cleaned. Wattle is okay to remain on adjacent lot because it will be used during the SFH home that is planned on the site and is below the hillside erosion down from Alto Via lots...
No further inspections. Permit finaled.
|
ESC14-00848
| DOC - Permit Finaled | 4/30/2015 | 4/30/2015 | 4/30/2015 2:35:30 PM | P | PASS |
|
|
|
ESC14-00977
| Site Final | 4/29/2015 | 4/30/2015 | 4/30/2015 1:42:55 PM | P | PART |
|
|
Starbucks is complete and open for business. Site is stablized. 1 correction needed to final out permit:
Remove temp BMP per permit conditions (inlet bag on MS4 on Vista, south of Cassia)
Called RP Tony, he will have it removed and I said I would check back end of next week.
No other issues at site.
|
ESC14-01158
| Random Inspection | 4/30/2015 | 4/30/2015 | 4/30/2015 1:27:22 PM | P | PEND |
|
|
Cell tower is complete and appears to be operational. Need to clean up site and remove permit and miscellaneous materials. No trackout or sediment leaving site. Tractor & trailer still here...BLD open
|
ESC13-01333
| Aging Inspection | 4/30/2015 | 4/30/2015 | 4/30/2015 12:56:48 PM | | PASS |
|
|
No violations observed. See ESC13-01323 for details. Permit finaled.
|
ESC13-01333
| DOC - Permit Finaled | 4/30/2015 | 4/30/2015 | 4/30/2015 12:56:37 PM | P | PASS |
|
|
|
ESC13-01332
| Aging Inspection | 4/30/2015 | 4/30/2015 | 4/30/2015 12:56:29 PM | | PASS |
|
|
No violations observed. See ESC13-01323 for details. Permit finaled.
|
ESC13-01332
| DOC - Permit Finaled | 4/30/2015 | 4/30/2015 | 4/30/2015 12:56:16 PM | P | PASS |
|
|
|
ESC13-01331
| Aging Inspection | 4/30/2015 | 4/30/2015 | 4/30/2015 12:56:06 PM | | PASS |
|
|
No violations observed. See ESC13-01323 for details. Permit finaled.
|
ESC13-01331
| DOC - Permit Finaled | 4/30/2015 | 4/30/2015 | 4/30/2015 12:55:56 PM | P | PASS |
|
|
|
ESC13-01330
| Aging Inspection | 4/30/2015 | 4/30/2015 | 4/30/2015 12:55:43 PM | | PASS |
|
|
No violations observed. See ESC13-01323 for details. Permit finaled.
|
ESC13-01330
| DOC - Permit Finaled | 4/30/2015 | 4/30/2015 | 4/30/2015 12:54:59 PM | P | PASS |
|
|
|
ESC13-01323
| General Inspection | 4/30/2015 | 4/30/2015 | 4/30/2015 12:54:45 PM | P | PASS |
|
|
WIP on all 22 four-plexes at Cantabria. Foundation work complete and lined washout was used on site. Silt fence sediment control installed along the canal and in good condion. No trackout, no discharges. Trash is contained. MS4 on Overland and Cloverdale have inlet protection. Inspections will continue at least 1x per 2 weeks till completion; NOTE: closed permits (ESC13-01330 to ESC13-01333) to reduce inspection frequency.
1 correction needed:
Install sediment protection on prvate storm
|
ESC15-00266
| General Inspection | 4/30/2015 | 4/30/2015 | 4/30/2015 12:21:43 PM | P | PASS |
|
|
Townhome foundation in progress in Bella Vista. BMPs installed, no violations at site. RP/GC is on site. DIs protected. First phase of 7 homes has completed foundations. Cement washout used and liquid is drying. No spills.
Requested that trash container be on site once vertical construction begins. No corrections needed.
|
ESC14-00892
| General Inspection | 4/29/2015 | 4/30/2015 | 4/30/2015 12:18:59 PM | A | PASS |
|
|
Townhome construction in progress. First 7 foundations have been poured, a lined cement washout was properly used.
RP/GC Gary onsite. Once foundation work is complete on east side, they will move washout to SE corner in order to start on west side. Each townhome has seperate permit between (ESC15-00266 to 284)
No dust, trackout, or uncontained trash or materials. Very clean site, inlet protection is installed. Approved.
|
ESC14-01030
| General Inspection | 4/30/2015 | 4/30/2015 | 4/30/2015 10:39:01 AM | | PASS |
|
|
|
ESC14-00885
| General Inspection | 4/30/2015 | 4/30/2015 | 4/30/2015 9:55:13 AM | | PASS |
|
|
Greenbelt path complete and in use. Shoulders have been hydroseeded and vegetation is still establishing. Next inspection will check to see if disturbed areas are stabilized and temp BMPs may be removed.
|
ESC14-00868
| General Inspection | 4/30/2015 | 4/30/2015 | 4/30/2015 9:11:32 AM | | PASS |
|
|
|
ESC14-00764
| Aging Inspection | 4/30/2015 | 4/30/2015 | 4/30/2015 8:48:27 AM | | PASS |
|
|
Home complete. ESC conditions satisfied. Temp BMPs to remain due to active construction in Tianna Park.
|
ESC14-00764
| DOC - Permit Finaled | 4/30/2015 | 4/30/2015 | 4/30/2015 8:47:30 AM | P | PASS |
|
|
|