ELE19-01485
| Electrical Rough-In | 4/29/2019 | 4/30/2019 | 4/30/2019 2:37:49 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Rob Maes...job complete, unable to verify equipment, no access to roof have been aware of requirements for rough inspection...double fees will be applied material will be removed off roof so verification can be done
|
ELE19-01568
| Electrical Rough-In | 4/30/2019 | 4/30/2019 | 4/30/2019 2:09:21 PM | P | PASS |
|
|
rough in ceiling inspection. Chad VanOrden is contact at ###-####. Phone #: ###-#### Inspection requested via web by Debby Pierce... grid ok and rough in of added outlet wall btwn bathrooms ok to cover complete job is lighting fixture relocation, 1 added outlet and GFCI protection in breakroom
|
ELE19-01122
| Final | 4/30/2019 | 4/30/2019 | 4/30/2019 1:45:42 PM | P | PASS |
|
|
labelling, disconnect, and OCPD ok to final
|
ELE17-01969
| ELE-Aging Inspection | 4/30/2019 | 4/30/2019 | 4/30/2019 12:35:40 PM | | PASS |
|
|
DOC expired
|
ELE17-01969
| DOC - Permit Expired | 4/30/2019 | 4/30/2019 | 4/30/2019 12:35:24 PM | P | PASS |
|
|
permit expired as with plumbing permit
|
ELE19-01567
| Final | 4/30/2019 | 4/30/2019 | 4/30/2019 12:31:08 PM | P | NR |
|
|
If possible, we would like to request early afternoon inspection - electrician is on site now.
Final for trim out ; installation of owner provided materials (switches, recepts, fixtures) - all other electrical done by other contractors.
Keith Chetta is electrician Phone #: ###-#### Inspection requested via web by JENNY EMEL... contractor taking over responsibility for work done by others under permit ELE18-04056...not ready...missing material...reschedule when complete
|
ELE18-04056
| Final | 4/30/2019 | 4/30/2019 | 4/30/2019 12:29:00 PM | P | PASS |
|
|
to close out permit...contractor ok with finaling permit...rough in only no further work done under this permit...final work done under permit ELE19-01567...see future notes on this permit
|
ELE19-01518
| Electrical Rough-In | 4/30/2019 | 4/30/2019 | 4/30/2019 11:07:55 AM | P | PASS |
|
|
Contact: Rob Lawrence... early inspection if possible please Phone #: ###-#### Inspection requested via web by Deb Gooden.. rough ok to cover added switch and light to new side access to bathroom and moved outlet in living rm for new door-outlet complete
|
ELE19-01122
| Electrical Rough-In | 4/29/2019 | 4/30/2019 | 4/30/2019 10:57:23 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by BRS Permitting... UL listing verified breaker in panel and labelling of verified no access needed for final
|
ELE19-01418
| Final | 4/29/2019 | 4/30/2019 | 4/30/2019 10:19:41 AM | A | PASS |
|
|
Need inspection for 10:00 AM. Final for service and hot tub. Phone #: ###-#### Inspection requested via web by Alan Lusk... ok to final
|
ELE19-01511
| Electrical Rough-In | 4/29/2019 | 4/30/2019 | 4/30/2019 9:41:22 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by David Nelson... corrections made...perm service inspection required to be scheduled along with rough-in has been added for this inspection but will not be in future..contractors responsibility rough ok to cover
|
ELE19-01511
| Permanent Service | 4/30/2019 | 4/30/2019 | 4/30/2019 9:38:29 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by David Nelson... p/s u/g new ok
|
ELE18-04507
| Final | 4/30/2019 | 4/30/2019 | 4/30/2019 9:35:24 AM | P | CANC |
|
|
Please call Preston Saey, the electrician, one hour before arriving on site so he can meet you there. ###-#### Phone #: ###-#### >> Inspection requested via web by Rob Maes Inspection cancelled from web by: Rob Maes
|
ELE19-00986
| Final | 4/30/2019 | 4/30/2019 | 4/30/2019 9:03:56 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Greg Idsinga... ok to final
|
ELE19-00986
| Electrical Rough-In | 4/30/2019 | 4/30/2019 | 4/30/2019 9:03:25 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Greg Idsinga... ceiling grid ok
|
ELE19-00672
| Permanent Service | 4/29/2019 | 4/30/2019 | 4/30/2019 8:41:01 AM | A | PASS |
|
|
We will be on site need service inspected Phone #: ###-#### Inspection requested via web by robert feller... p/s u/g ok...existing service used powering new circuits
|
ELE19-00672
| Electrical Rough-In | 4/30/2019 | 4/30/2019 | 4/30/2019 8:40:08 AM | A | PASS |
|
|
We will be on site need service inspected Phone #: ###-#### Inspection requested via web by robert feller... new transformers and panels off existing service grounding, bonding, and seperation neutrals verified rough ok
|
ELE17-01841
| Final | 4/25/2019 | 4/30/2019 | 4/30/2019 8:03:39 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kelly Felin... rooftop RTU replaced...service outlet installed circuit from existing panel...piped on surface ok to final
|