BLD97-00105
| INSP - Framing/Rough-in | 4/2/1997 | 4/4/1997 | 4/7/1997 12:00:00 AM | P | FAIL |
|
|
ok to insulate
|
BLD97-00567
| INSP - Framing/Rough-in | 4/4/1997 | 4/4/1997 | 4/7/1997 12:00:00 AM | P | FAIL |
|
|
do not cover
|
BLD97-00609
| INSP - Framing/Rough-in | 4/4/1997 | 4/4/1997 | 4/7/1997 12:00:00 AM | P | PASS |
|
|
ok
|
BLD96-02415
| INSP - Letter of compliance | 4/4/1997 | 4/4/1997 | 4/4/1997 12:00:00 AM | | PASS |
|
|
lc#13759
|
BLD96-02415
| INSP - Final | 4/3/1997 | 4/4/1997 | 4/4/1997 12:00:00 AM | A | PASS |
|
|
|
BLD97-00295
| INSP - Framing/Rough-in | 4/3/1997 | 4/4/1997 | 4/4/1997 12:00:00 AM | A | NR |
|
|
plans and truss egineering not on site.
|