Inspections for the day of: Wednesday, April 4, 2001.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-00668 BLD-Conference4/3/20014/4/20014/4/2001 12:00:00 AMAPART
This permit has not been issued, working w/out valid permits, (Cricket Communications), place SWO..325. contractor not on site left note to call me. 4/4/2001 6:02:16 PM
BLD00-02937 BLD-Framing/Rough-in4/3/20014/4/20014/4/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 04/03/2001 at 22:53:31. Contact: ###-####.
BLD00-02937 BLD-Framing/Rough-in4/3/20014/4/20014/4/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 04/03/2001 at 22:53:31. Contact: ###-####. need to verify sheetrock at ext wall in upper floor return chase through the vent. 4/4/2001 2:09:45 PM
BLD00-02937 BLD-Energy code compliance4/3/20014/4/20014/4/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 04/03/2001 at 22:54:08. Contact: ###-####.
BLD00-02937 BLD-Energy code compliance4/3/20014/4/20014/4/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 04/03/2001 at 22:54:08. Contact: ###-####.
BLD00-03695 BLD-Final4/3/20014/4/20014/4/2001 12:00:00 AMAPASS
###-####
BLD00-03498 BLD-Framing/Rough-in4/3/20014/4/20014/4/2001 12:00:00 AMAPART
steel\\###-####
BLD01-00265 BLD-Footing4/3/20014/4/20014/4/2001 12:00:00 AMAPART
Frank ###-#### interior wall 1 firewall also c/n posted in job trailer with ,jom mgr. 4/4/2001 1:45:10 PM
BLD01-00759 BLD-Foundation4/3/20014/4/20014/4/2001 12:00:00 AMPPART
###-####
BLD01-00758 BLD-Foundation4/3/20014/4/20014/4/2001 12:00:00 AMPPART
###-####
BLD01-00757 BLD-Foundation4/3/20014/4/20014/4/2001 12:00:00 AMPPART
###-####
BLD00-03194 BLD-Footing4/4/20014/4/20014/4/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 04/04/2001 at 09:38:51. Contact: ###-####. 2 10x10 footing and elevator shaft footingds ok. 4/4/2001 3:53:00 PM
BLD01-00468 BLD-Framing/Rough-in4/4/20014/4/20014/4/2001 12:00:00 AMPFAIL
shear\\###-#### c/n posted ok to insulate. 4/4/2001 3:52:04 PM
BLD00-03450 BLD-Final4/4/20014/4/20014/4/2001 12:00:00 AMPFAIL
Added by Inspector: 407 On 4/4/2001 6:04:49 PM . still need the block added to the mariage line about 10 in from south side near crawl hole at yellow tag see prior insp. called denis, i was back out today at his request called him back to tell him ,same thing. 4/4/2001 6:06:55 PM