Inspections for the day of: Thursday, April 4, 2002.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-01647 BLD-Framing/Rough-in4/3/20024/4/20024/4/2002 12:00:00 AMAFAIL
###-#### tape draftstop joints 4/4/2002 11:58:46 AM
BLD02-00270 BLD-Framing/Rough-in4/3/20024/4/20024/4/2002 12:00:00 AMAFAIL
###-#### permitor wires must be 12 gauge/need exit hardware at back vestabual. 4/4/2002 11:59:48 AM
BLD01-00644 BLD-Final4/3/20024/4/20024/4/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 04/03/2002 at 15:16:51. Contact: ###-####. ok for c/o 4/4/2002 11:57:16 AM
BLD01-00650 BLD-Final4/3/20024/4/20024/4/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 04/03/2002 at 15:17:52. Contact: ###-####. landings at 3rd floor exit max 3/4 elavation transition. 4/4/2002 11:58:14 AM
BLD02-00202 BLD-Final4/4/20024/4/20024/4/2002 12:00:00 AMACANC
Scheduled by Inspector: 409 On 4/4/2002 8:29:34 AM
BLD01-02848 BLD-Framing/Rough-in3/13/20024/4/20024/4/2002 12:00:00 AMAPART
###-#### or ###-#### Les pending special inspction. 4/4/2002 12:10:30 PM
BLD01-02848 BLD-Framing/Rough-in3/13/20024/4/20024/4/2002 12:00:00 AMACANC
###-#### or ###-#### Les
MEC02-00488 Pressure Test4/3/20024/4/20024/4/2002 12:00:00 AMPCANC
BLD01-01863 BLD-Framing/Rough-in4/4/20024/4/20024/4/2002 12:00:00 AMPPART
dave- ###-#### ceiling grid combustables removed from ceilling c/n made ok. 4/5/2002 9:41:10 AM
BLD01-02848 BLD-Concrete4/4/20024/4/20024/4/2002 12:00:00 AMPPART
rebar les- ###-#### covered with special insp 4/5/2002 7:36:16 AM
MEC02-00895 Rough-in4/4/20024/4/20024/4/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 04/04/2002 at 09:06:27. Contact: ###-####.
MEC02-00895 Pressure Test4/4/20024/4/20024/4/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 04/04/2002 at 09:06:51. Contact: ###-####.